This Technical Specification specifies the definitions, the criteria, and the application and assessment procedures, as well as the respective documentation related to a system of qualification of electrical installation contractors. This qualification system includes electrical installation works including equipment supply. The manufacturing process of such equipment is excluded from this system.

  • Technical specification
    68 pages
    English language
    e-Library read for
    1 day
  • Technical specification – translation
    68 pages
    Slovenian language
    e-Library read for
    1 day

Superseded by CLC/TS 50349:2004

  • Standardization document
    49 pages
    English language
    e-Library read for
    1 day

Frequently Asked Questions

CLC/TC 218 is a Technical Committee within CLC. It is named "Qualification of electrical installation contractors" and is responsible for: To prepare a standard defining the characteristics and relevant general criteria and references for qualification of electrical contractors undertaking electrical power works, electronic and telecommunication works and other electrical installations, included under directive 93/37/EEC. The qualification will be general and will not be limited to a single contract application. It will also be possible to relate it to given types of contracts. To provide the input of CENELEC into the corresponding work of CEN under co-operation mode 4. The work of the Technical Committee will aim at the qualification of electrical contractors under application of directive 93/37/EEC. This committee has published 2 standards.

CLC/TC 218 develops CLC standards in the area of U94 - PUBLIC PROCUREMENT MATTERS. The scope of work includes: To prepare a standard defining the characteristics and relevant general criteria and references for qualification of electrical contractors undertaking electrical power works, electronic and telecommunication works and other electrical installations, included under directive 93/37/EEC. The qualification will be general and will not be limited to a single contract application. It will also be possible to relate it to given types of contracts. To provide the input of CENELEC into the corresponding work of CEN under co-operation mode 4. The work of the Technical Committee will aim at the qualification of electrical contractors under application of directive 93/37/EEC. Currently, there are 2 published standards from this technical committee.

CLC is a standardization organization that develops and publishes standards to support industry, commerce, and regulatory requirements.

A Technical Committee (TC) in CLC is a group of experts responsible for developing international standards in a specific technical area. TCs are composed of national member body delegates and work through consensus to create standards that meet global industry needs. Each TC may have subcommittees (SCs) and working groups (WGs) for specialized topics.