ASTM D5078/D5078M-11
(Specification)Standard Specification for Crack Filler, Hot-Applied, for Asphalt Concrete and Portland Cement Concrete Pavements
Standard Specification for Crack Filler, Hot-Applied, for Asphalt Concrete and Portland Cement Concrete Pavements
ABSTRACT
This specification covers the standards for hot-applied crack filler proposed for use in filling cracks in asphalt concrete and portland cement concrete pavements. The filler shall be a compound that will effectively fill cracks in concretes and shall resist softening and pickup by vehicle tires at ambient summer temperatures. The fillers shall also comply with the requirements set for the safe heating temperature, softening point, cone penetration, resilience, and asphalt compatibility.
SCOPE
1.1 This specification covers hot-applied crack filler for use in filling cracks in asphalt concrete and portland cement concrete pavements.
1.2 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in nonconformance with the standard.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
General Information
Relations
Buy Standard
Standards Content (Sample)
NOTICE: This standard has either been superseded and replaced by a new version or withdrawn.
Contact ASTM International (www.astm.org) for the latest information
Designation: D5078/D5078M −11
StandardSpecification for
Crack Filler, Hot-Applied, for Asphalt Concrete and Portland
1
Cement Concrete Pavements
This standard is issued under the fixed designation D5078/D5078M; the number immediately following the designation indicates the
year of original adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last
reapproval. A superscript epsilon (´) indicates an editorial change since the last revision or reapproval.
1. Scope cement concrete pavements. The crack filler shall resist soft-
ening and pickup by vehicle tires at ambient summer tempera-
1.1 This specification covers hot-applied crack filler for use
tures when used in an appropriate manner. The material shall
in filling cracks in asphalt concrete and portland cement
be capable of being heated to the specified safe heating
concrete pavements.
temperature (see 4.1) in appropriate melting units, shall be
1.2 The values stated in either SI units or inch-pound units
capable of being effectively applied to pavement cracks
are to be regarded separately as standard. The values stated in
through pressure fed melter-applicator equipment, and shall be
each system may not be exact equivalents; therefore, each
3
suitableforfillingcracksthatareaminimumof9.5mm[ ⁄8in.]
system shall be used independently of the other. Combining
in width (see Appendix X1).
values from the two systems may result in nonconformance
with the standard.
4. Physical Requirements
1.3 This standard does not purport to address all of the
4.1 Safe Heating Temperature—The safe heating tempera-
safety concerns, if any, associated with its use. It is the
ture is the highest temperature to which the crack filler can be
responsibility of the user of this standard to establish appro-
heated and still conform to all requirements of this specifica-
priate safety and health practices and determine the applica-
tion. The safe heating temperature shall be a minimum of 11°C
bility of regulatory limitations prior to use.
[20°F] higher than the manufacturer’s minimum recommended
application temperature. For testing purposes, the pouring
2. Referenced Documents
temperature for specimen preparation shall be the safe heating
2
2.1 ASTM Standards: temperature recommended by the manufacturer. The safe
D5 Test Method for Penetration of Bituminous Materials heating temperature shall be shown on all containers and shall
D36 Test Method for Softening Point of Bitumen (Ring-and- be provided to the testing agency before any laboratory tests
Ball Apparatus) are begun.
D217 Test Methods for Cone Penetration of Lubricating
4.2 Softening Point— The softening point of the crack filler
Grease
shall be a minimum of 65.5°C [150°F].
D5167 Practice for Melting of Hot-Applied Joint and Crack
4.3 Cone Penetration, Non-Immersed—At 25 6 0.1°C [77
Sealant and Filler for Evaluation
6 0.2°F], 150 g, for 5 s, shall not exceed 70 units.
D5329 Test Methods for Sealants and Fillers, Hot-Applied,
for Joints and Cracks in Asphaltic and Portland Cement 4.4 Cone Penetration at 4°C [39.2°F]—At 4 6 0.1°C [39.2
Concrete Pavements
6 0.2°F], 200 g, for 60 s, shall be a minimum of 15 units.
4.5 Resilience—At 25 6 0.1°C [77 6 0.2°F], shall be a
3. General Requirements
minimum of 30 % recovery.
3.1 The hot-applied crack filler shall be a compound that
4.6 Asphalt Compatibility—There shall be no failure in
will effectively fill cracks in both asphalt concrete and portland
adhesion, formation of an oily exudate at the interface between
the crack filler and the asphalt concrete specimen, or softening
1
This specification is under the jurisdiction of ASTM Committee D04 on Road or other deleterious effects on the asphalt concrete or crack
and Paving Materials and is the direct responsibility of Subcommittee D04.33 on
filler when tested at 60°C [140°F] for 72 h.
Formed In-Place Sealants for Joints and Cracks in Pavements.
Current edition approved June 1, 2011. Published June 2011. Originally
5. Sampling
approved in 1990. Last previous edition approved in 2006 as D5078 – 95 (2006).
DOI: 10.1520/D5078_D578M-11.
5.1 Samples may be taken at the plant or warehouse prior to
2
For referenced ASTM standards, visit the ASTM website, www.astm.org, or
delivery or at the time of delivery, at the option of the
contact ASTM Customer Service at service@astm.org. For Annual Book of ASTM
purchaser. If sampling is done prior to shipment, the inspector
Standards volume information, refer to the standard’s Document Summary page on
the ASTM website. representingthepurchasershallhavefreeaccesstothematerial
Copyright © ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States
1
---------------------- Page: 1 ----------------------
D5078/D5078M − 11
to be sampled. The inspector shall be afforde
...
This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Because
it may not be technically possible to adequately depict all changes accurately, ASTM recommends that users consult prior editions as appropriate. In all cases only the current version
of the standard as published by ASTM is to be considered the official document.
Designation:D5078–95 (Reapproved 2006) Designation: D5078/D5078M – 11
Standard Specification for
Crack Filler, Hot-Applied, for Asphalt Concrete and Portland
1
Cement Concrete Pavements
This standard is issued under the fixed designation D5078/D5078M; the number immediately following the designation indicates the
year of original adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last
reapproval. A superscript epsilon (´) indicates an editorial change since the last revision or reapproval.
1. Scope
1.1 This specification covers hot-applied crack filler for use in filling cracks in asphalt concrete and portland cement concrete
pavements.
1.2The values stated in inch-pound units are to be regarded as the standard. The values in parentheses are for information only.
1.2 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each
system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the
two systems may result in nonconformance with the standard.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility
of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory
limitations prior to use.
2. Referenced Documents
2
2.1 ASTM Standards:
D5 Test Method for Penetration of Bituminous Materials
D36 Test Method for Softening Point of Bitumen (Ring-and-Ball Apparatus)
D217 Test Methods for Cone Penetration of Lubricating Grease
D5167 Practice for Melting of Hot-Applied Joint and Crack Sealant and Filler for Evaluation
D5329 Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphaltic and Portland Cement Concrete
Pavements
3. General Requirements
3.1 The hot-applied crack filler shall be a compound that will effectively fill cracks in both asphalt concrete and portland cement
concrete pavements. The crack filler shall resist softening and pickup by vehicle tires at ambient summer temperatures when used
in an appropriate manner. The material shall be capable of being heated to the specified safe heating temperature (see 4.1) in
appropriate melting units, shall be capable of being effectively applied to pavement cracks through pressure fed melter-applicator
3
equipment, and shall be suitable for filling cracks that are a minimum of 9.5 mm [ ⁄8 in.] in width (see Appendix X1).
4. Physical Requirements
4.1 Safe Heating Temperature—The safe heating temperature is the highest temperature to which the crack filler can be heated
and still conform to all requirements of this specification. The safe heating temperature shall be a minimum of 20°F (11°C)11°C
[20°F] higher than the manufacturer’s minimum recommended application temperature. For testing purposes, the pouring
temperature for specimen preparation shall be the safe heating temperature recommended by the manufacturer. The safe heating
temperature shall be shown on all containers and shall be provided to the testing agency before any laboratory tests are begun.
4.2 Softening Point— The softening point of the crack filler shall be a minimum of 150°F (65.5°C). 65.5°C [150°F].
4.3 Cone Penetration, Non-Immersed —At 7725 6 0.2°F (250.1°C [77 6 0.1°C),0.2°F], 150 g, for 5 s, shall not exceed 70
units.
4.4 Cone Penetration at 39.2°F (4°C)4°C [39.2°F]—At 39.24 6 0.2°F (40.1°C [39.2 6 0.1°C),0.2°F], 200 g, for 60 s, shall
be a minimum of 15 units.
1
This specification is under the jurisdiction ofASTM Committee D04 on Road and Paving Materials and is the direct responsibility of Subcommittee D04.33 on Formed-
In-Place Sealants for Joints and Cracks in Pavements.
Current edition approved June 1, 2006.2011. Published June 2006.2011. Originally approved in 1990. Last previous edition approved in 20002006 as D5078 – 95 (20006).
DOI: 10.1520/D5078-95R06.10.1520/D5078_D578M-11.
2
For referencedASTM standards, visit theASTM website, www.astm.org, or contactASTM Customer Service at service@astm.org. For Annual Book ofASTM Standards
volume information, refer to the standard’s Document Summary page on the ASTM website.
Copyright © ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.
1
---------------------- Page: 1 ----------------------
D5078/D5078M – 11
4.5 Resilience—At 7725 6 0.2°F (250.1°C [77 6 0.1°C),0.2°F], shall be a minimum of 30 % recovery.
4.6 Asphal
...








Questions, Comments and Discussion