Communication networks and systems for power utility automation - Part 10: Conformance testing

IEC 61850-10:2012 specifies standard techniques for testing of conformance of client, server and sampled value devices and engineering tools, as well as specific measurement techniques to be applied when declaring performance parameters. The use of these techniques will enhance the ability of the system integrator to integrate IEDs easily, operate IEDs correctly, and support the applications as intended. The major technical changes with regard to the previous edition are as follows:  - updates to server device conformance test procedures;  - additions of certain test procedures (client device conformance, sampled values device conformance, (engineering) tool related conformance, GOOSE performance).

/

Réseaux et systèmes de communication pour l'automation des systèmes électriques - Partie 10: Essais de conformité

La CEI 61850-10:2012 spécifie les techniques courantes d'essais de conformité du client, du serveur et des dispositifs à valeurs échantillonnées, ainsi que des outils techniques, et les techniques de mesurage spécifiques à appliquer pour la déclaration des paramètres de performances. L'emploi de ces techniques renforce la capacité de l'intégrateur de systèmes à intégrer aisément les IED, à les exploiter correctement et à prendre en charge les applications, tel que prévu. Les modifications techniques principales par rapport à l'édition précédente sont les suivantes:  - actualisation des procédures d'essai de conformité du serveur,  - ajout de certaines procédures d'essai (conformité du système client, conformité des dispositifs à valeurs échantillonnées, conformité associée aux outils (techniques), performances GOOSE).

Komunikacijska omrežja in sistemi za avtomatizacijo porabe električne energije - 10. del: Preskušanje skladnosti (IEC 61850-10:2012)

Ta del IEC 61850 določa standardne tehnike za preskušanje skladnosti odjemalca, strežnika, naprav z vzorčenimi vrednostmi in inženirskih orodij ter tudi specifične merilne tehnike za označevanje parametrov delovanja. Z uporabo teh tehnik se bo izboljšala zmožnost sistemskega integratorja za preprosto integracijo pametnih elektronskih naprav (IED), pravilno upravljanje IED-jev ter ustrezno podporo aplikacijam.

General Information

Status
Published
Publication Date
20-Aug-2013
Technical Committee
Current Stage
6060 - National Implementation/Publication (Adopted Project)
Start Date
30-Jul-2013
Due Date
04-Oct-2013
Completion Date
21-Aug-2013

Relations

Standard
SIST EN 61850-10:2013
English language
87 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)


SLOVENSKI STANDARD
01-september-2013
1DGRPHãþD
SIST EN 61850-10:2005
.RPXQLNDFLMVNDRPUHåMDLQVLVWHPL]DDYWRPDWL]DFLMRSRUDEHHOHNWULþQHHQHUJLMH
GHO3UHVNXãDQMHVNODGQRVWL ,(&
Communication networks and systems for power utility automation - Part 10:
Conformance testing
/
Réseaux et systèmes de communication pour l'automation des systèmes électriques -
Partie 10: Essais de conformité
Ta slovenski standard je istoveten z: EN 61850-10:2013
ICS:
29.240.30 Krmilna oprema za Control equipment for electric
elektroenergetske sisteme power systems
33.200 Daljinsko krmiljenje, daljinske Telecontrol. Telemetering
meritve (telemetrija)
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

EUROPEAN STANDARD
EN 61850-10
NORME EUROPÉENNE
July 2013
EUROPÄISCHE NORM
ICS 33.200 Supersedes EN 61850-10:2005

English version
Communication networks and systems for power utility automation -
Part 10: Conformance testing
(IEC 61850-10:2012)
Réseaux et systèmes de communication Kommunikationsnetze und -systeme in
pour l'automatisation des systèmes Stationen -
électriques - Teil 10: Konformitätsprüfung
Partie 10: Essais de conformité (IEC 61850-10:2012)
(CEI 61850-10:2012)
This European Standard was approved by CENELEC on 2013-01-18. CENELEC members are bound to comply
with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard
the status of a national standard without any alteration.

Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the CEN-CENELEC Management Centre or to any CENELEC member.

This European Standard exists in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CENELEC member into its own language and notified
to the CEN-CENELEC Management Centre has the same status as the official versions.

CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus,
the Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany,
Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland,
Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung

Management Centre: Avenue Marnix 17, B - 1000 Brussels

© 2013 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.
Ref. No. EN 61850-10:2013 E
Foreword
The text of document 57/1284/FDIS, future edition 2 of IEC 61850-10, prepared by IEC TC 57 "Power
systems management and associated information exchange" was submitted to the IEC-CENELEC
parallel vote and approved by CENELEC as EN 61850-10:2013.

The following dates are fixed:
• latest date by which the document has (dop) 2014-01-05
to be implemented at national level by
publication of an identical national
standard or by endorsement
(dow) 2016-01-18
• latest date by which the national
standards conflicting with the

document have to be withdrawn
This document supersedes EN 61850-10:2005.
– server device conformance test procedures have been updated;
– client device conformance test procedures have been added;
– sampled values device conformance test procedures have been added;
– (engineering) tool related conformance test procedures have been added;
– GOOSE performance test procedures have been added.
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CENELEC [and/or CEN] shall not be held responsible for identifying any or all such patent
rights.
Endorsement notice
The text of the International Standard IEC 61850-10:2013 was approved by CENELEC as a European
Standard without any modification.

- 3 - EN 61850-10:2013
Annex ZA
(normative)
Normative references to international publications
with their corresponding European publications

The following documents, in whole or in part, are normatively referenced in this document and are
indispensable for its application. For dated references, only the edition cited applies. For undated
references, the latest edition of the referenced document (including any amendments) applies.

NOTE  When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD
applies.
Publication Year Title EN/HD Year

IEC/TS 61850-2 - Communication networks and systems in - -
substations -
Part 2: Glossary
IEC 61850-3 - Communication networks and systems for EN 61850-3 -
power utility automation -
Part 3: General requirements
IEC 61850-4 2011 Communication networks and systems for EN 61850-4 2011
power utility automation -
Part 4: System and project management

1)
IEC 61850-5 2003 Communication networks and systems in EN 61850-5 2003
substations -
Part 5: Communication requirements for
functions and device models
IEC 61850-6 2009 Communication networks and systems for EN 61850-6 2010
power utility automation -
Part 6: Configuration description language for
communication in electrical substations
related to IEDs
IEC 61850-7-1 2011 Communication networks and systems for EN 61850-7-1 2011
power utility automation -
Part 7-1: Basic communication structure -
Principles and models
IEC 61850-7-2 2010 Communication networks and systems for EN 61850-7-2 2010
power utility automation -
Part 7-2: Basic information and
communication structure - Abstract
communication service interface (ACSI)

IEC 61850-7-3 2010 Communication networks and systems for EN 61850-7-3 2011
power utility automation -
Part 7-3: Basic communication structure -
Common data classes
IEC 61850-7-4 2010 Communication networks and systems for EN 61850-7-4 2010
power utility automation -
Part 7-4: Basic communication structure -
Compatible logical node classes and data
object classes
1)
EN 61850-5 is superseded by EN 61850-5:2013, which is based on IEC 61850-5:2013.

Publication Year Title EN/HD Year
IEC 61850-8-1 2011 Communication networks and systems for EN 61850-8-1 2011
power utility automation -
Part 8-1: Specific Communication Service
Mapping (SCSM) - Mappings to MMS (ISO
9506-1 and ISO 9506-2) and to ISO/IEC
8802-3
IEC 61850-9-2 2011 Communication networks and systems for EN 61850-9-2 2011
power utility automation -
Part 9-2: Specific Communication Service
Mapping (SCSM) - Sampled values over
ISO/IEC 8802-3
IEC 62439-3 2012 Industrial communication networks - High EN 62439-3 2012
availability automation networks -
Part 3: Parallel Redundancy Protocol (PRP)
and High availability Seamless Redundancy
(HSR)
ISO 9001 - Quality management systems - EN ISO 9001 -
Requirements
ISO 9506 Series Industrial automation systems - - -
Manufacturing Message Specification

ISO/IEC 9646 Series Information technology - Open Systems EN ISO/IEC 9646 -
Interconnection - Conformance testing
methodology and framework
IEEE 1588 2008 IEEE Standard for a Precision Clock - -
Synchronization Protocol for Networked
Measurement and Control Systems

IEC 61850-10 ®
Edition 2.0 2012-12
INTERNATIONAL
STANDARD
NORME
INTERNATIONALE
colour
inside
Communication networks and systems for power utility automation –

Part 10: Conformance testing
Réseaux et systèmes de communication pour l'automatisation des systèmes

électriques –
Partie 10: Essais de conformité

INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
COMMISSION
ELECTROTECHNIQUE
PRICE CODE
INTERNATIONALE
CODE PRIX XC
ICS 33.200 ISBN 978-2-83220-557-0

– 2 – 61850-10 © IEC:2012
CONTENTS
FOREWORD . 6
INTRODUCTION . 8
1 Scope . 9
2 Normative references . 9
3 Terms and definitions . 10
4 Abbreviated terms . 12
5 Introduction to conformance testing . 13
5.1 General . 13
5.2 Conformance test procedures . 14
5.3 Quality assurance and testing . 14
5.3.1 General . 14
5.3.2 Quality plan . 15
5.4 Testing . 16
5.4.1 General . 16
5.4.2 Use of SCL files. 17
5.4.3 Device testing . 17
5.5 Documentation of conformance test report . 18
6 Device related conformance testing . 19
6.1 Test methodology . 19
6.2 Conformance test procedures . 19
6.2.1 General . 19
6.2.2 Test procedure requirements . 19
6.2.3 Test structure . 20
6.2.4 Test cases to test a server device . 20
6.2.5 Test cases to test a client device . 44
6.2.6 Test cases to test sampled values device . 60
6.2.7 Acceptance criteria . 65
7 Tool related conformance testing . 65
7.1 General guidelines . 65
7.1.1 Test methodology . 65
7.1.2 Test system architecture . 66
7.2 Conformance test procedures . 66
7.2.1 General . 66
7.2.2 Test procedure requirements . 66
7.2.3 Test structure . 66
7.2.4 Test cases to test an IED configurator tool . 66
7.2.5 Test cases to test a system configurator tool . 68
7.2.6 Acceptance criteria . 73
8 Performance tests . 73
8.1 General . 73
8.2 Communications latency . 74
8.2.1 Application domain . 74
8.2.2 Methodology . 74
8.2.3 GOOSE performance test . 75
8.3 Time synchronisation and accuracy . 79

61850-10 © IEC:2012 – 3 –
8.3.1 Application domain . 79
8.3.2 Methodology . 79
8.3.3 Testing criteria . 80
8.3.4 Performance . 81
9 Additional tests . 81
Annex A (informative) Examples of test procedure template . 82
Bibliography . 83

Figure 1 – Conceptual conformance assessment process . 17
Figure 2 – Test procedure format . 20
Figure 3 – Test system architecture to test a server device . 21
Figure 4 – Test system architecture to test a client device . 44
Figure 5 – Test system architecture to test a sampled values publishing device . 60
Figure 6 – Test system architecture to test a sampled values subscribing device . 61
Figure 7 – Test system architecture to test a configurator tool . 66
Figure 8 – Performance testing (black box principle) . 75
Figure 9 – Measure round trip time using GOOSE ping-pong method . 76
Figure 10 – Time synchronisation and accuracy test setup. 80

Table 1 – Server documentation test cases . 21
Table 2 – Server configuration test cases . 22
Table 3 – Server data model test cases . 22
Table 4 – Association positive test cases . 23
Table 5 – Association negative test cases . 24
Table 6 – Server positive test cases . 24
Table 7 – Server negative test cases . 25
Table 8 – Data set positive test cases . 26
Table 9 – Date set negative test cases . 27
Table 10 – Service tracking test cases . 28
Table 11 – Substitution positive test cases . 28
Table 12 – Setting group positive test cases . 29
Table 13 – Setting group negative test cases . 29
Table 14 – Unbuffered reporting positive test cases . 30
Table 15 – Unbuffered reporting negative test cases . 31
Table 16 – Buffered reporting positive test cases . 32
Table 17 – Buffered reporting negative test cases. 34
Table 18 – Log positive test cases . 35
Table 19 – Log negative test cases . 35
Table 20 – GOOSE publish positive test cases . 36
Table 21 – GOOSE subscribe positive test cases . 37
Table 22 – GOOSE management positive test cases . 37
Table 23 – GOOSE publish negative test cases . 37
Table 24 – GOOSE subscribe negative test cases . 38
Table 25 – GOOSE management negative test cases . 38

– 4 – 61850-10 © IEC:2012
Table 26 – Control test cases . 38
Table 27 – SBOes test cases . 40
Table 28 – DOns test cases . 41
Table 29 – SBOns test cases . 41
Table 30 – DOes test cases . 42
Table 31 – Time positive test cases . 42
Table 32 – Time negative test cases . 43
Table 33 – File transfer positive test cases . 43
Table 34 – File transfer negative test cases . 43
Table 35 – Network redundancy test cases . 44
Table 36 – Client documentation test cases . 45
Table 37 – Client configuration test cases . 45
Table 38 – Client data model test cases. 45
Table 39 – Association positive test cases . 46
Table 40 – Association negative test cases . 47
Table 41 – Server positive test cases. 47
Table 42 – Server negative test cases . 48
Table 43 – Data set positive test cases . 48
Table 44 – Data set negative test cases. 49
Table 45 – Service tracking test cases . 50
Table 46 – Substitution test cases . 50
Table 47 – Setting group positive test cases . 51
Table 48 – Setting group negative test cases . 51
Table 49 – Unbuffered reporting positive test cases . 52
Table 50 – Unbuffered reporting negative test cases . 53
Table 51 – Buffered reporting positive test cases . 53
Table 52 – Buffered reporting negative test cases. 55
Table 53 – Log positive test cases . 55
Table 54 – Log negative test cases . 56
Table 55 – GOOSE control block test cases . 56
Table 56 – Control general test cases . 56
Table 57 – SBOes test cases . 57
Table 58 – DOns test cases . 57
Table 59 – SBOns test cases . 58
Table 60 – DOes test cases . 58
Table 61 – Time positive test cases . 59
Table 62 – Time negative test cases . 59
Table 63 – File transfer positive test cases . 59
Table 64 – File transfer negative test cases . 59
Table 65 – Sampled values documentation test cases . 61
Table 66 – Sampled values configuration test cases . 62
Table 67 – Sampled values datamodel test cases . 62
Table 68 – Sampled value control block test cases . 63

61850-10 © IEC:2012 – 5 –
Table 69 – Send SV message publish test cases . 64
Table 70 – Send SV message subscribe positive test cases . 64
Table 71 – Send SV message subscribe negative test cases . 65
Table 72 – ICD test cases . 67
Table 73 – ICD export test cases . 67
Table 74 – SCD Import test cases . 67
Table 75 – IED configurator data model test cases . 68
Table 76 – IID export test cases . 68
Table 77 – Negative IID export test case . 68
Table 78 – System configurator documentation test case . 68
Table 79 – ICD / IID import test cases. 69
Table 80 – ICD / IID negative test case . 69
Table 81 – Communication engineering test cases. 70
Table 82 – Communication engineering negative test case . 70
Table 83 – Data flow test cases . 70
Table 84 – Data flow negative test cases . 70
Table 85 – Substation section handling test cases . 71
Table 86 – SCD modification test cases . 71
Table 87 – SCD export test cases . 72
Table 88 – SCD import test cases . 72
Table 89 – SED file handling test cases . 73
Table 90 – GOOSE performance test cases . 78

– 6 – 61850-10 © IEC:2012
INTERNATIONAL ELECTROTECHNICAL COMMISSION
____________
COMMUNICATION NETWORKS AND SYSTEMS
FOR POWER UTILITY AUTOMATION –

Part 10: Conformance testing
FOREWORD
1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
all national electrotechnical committees (IEC National Committees). The object of IEC is to promote
international co-operation on all questions concerning standardization in the electrical and electronic fields. To
this end and in addition to other activities, IEC publishes International Standards, Technical Specifications,
Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC
Publication(s)”). Their preparation is entrusted to technical committees; any IEC National Committee interested
in the subject dealt with may participate in this preparatory work. International, governmental and non-
governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely
with the International Organization for Standardization (ISO) in accordance with conditions determined by
agreement between the two organizations.
2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
consensus of opinion on the relevant subjects since each technical committee has representation from all
interested IEC National Committees.
3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
misinterpretation by any end user.
4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
transparently to the maximum extent possible in their national and regional publications. Any divergence
between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in
the latter.
5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity
assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any
services carried out by independent certification bodies.
6) All users should ensure that they have the latest edition of this publication.
7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and
members of its technical committees and IEC National Committees for any personal injury, property damage or
other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and
expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC
Publications.
8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is
indispensable for the correct application of this publication.
9) Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of
patent rights. IEC shall not be held responsible for identifying any or all such patent rights.
International Standard IEC 61850-10 has been prepared by IEC technical committee 57:
Power systems management and associated information exchange.
This second edition cancels and replaces the first edition published in 2005. It constitutes a
technical revision.
The major technical changes with regard to the previous edition are as follows:
– server device conformance test procedures have been updated;
– client device conformance test procedures have been added;
– sampled values device conformance test procedures have been added;
– (engineering) tool related conformance test procedures have been added;
– GOOSE performance test procedures have been added.

61850-10 © IEC:2012 – 7 –
The text of this standard is based on the following documents:
FDIS Report on voting
57/1284/FDIS 57/1303/RVD
Full information on the voting for the approval of this standard can be found in the report on
voting indicated in the above table.
This publication has been drafted in accordance with the ISO/IEC Directives, Part 2.
A list of all parts of IEC 61850 series, under the general title Communication networks and
systems for power utility automation, can be found on the IEC website.
The committee has decided that the contents of this publication will remain unchanged until
the stability date indicated on the IEC web site under "http://webstore.iec.ch" in the data
related to the specific publication. At this date, the publication will be
• reconfirmed,
• withdrawn,
• replaced by a revised edition, or
• amended.
IMPORTANT – The 'colour inside' logo on the cover page of this publication indicates
that it contains colours which are considered to be useful for the correct
understanding of its contents. Users should therefore print this document using a
colour printer.
– 8 – 61850-10 © IEC:2012
INTRODUCTION
This part of IEC 61850 is part of a set of specifications which details a layered power utility
communication architecture.
This part of IEC 61850 defines:
• the methods and abstract test cases for conformance testing of client, server and sampled
values devices used in power utility automation systems, and
• the methods and abstract test cases for conformance testing of engineering tools used in
power utility automation systems, and
• the metrics to be measured within devices according to the requirements defined in
IEC 61850-5.
The intended readers are IEC 61850 developers, test engineers and test system developers.
NOTE 1 Tests regarding EMC requirements and environmental conditions are subject to IEC 61850-3 and not
included in this part of IEC 61850.
It is recommended that IEC 61850-5 and IEC 61850-7-1 be read first in conjunction with
IEC 61850-7-2, IEC 61850-7-3, and IEC 61850-7-4.
NOTE 2 Abbreviations used in IEC 61850-10 are listed in Clause 4 or may be found in other parts of IEC 61850
that are relevant for conformance testing.

61850-10 © IEC:2012 – 9 –
COMMUNICATION NETWORKS AND SYSTEMS
FOR POWER UTILITY AUTOMATION –

Part 10: Conformance testing
1 Scope
This part of IEC 61850 specifies standard techniques for testing of conformance of client,
server and sampled value devices and engineering tools, as well as specific measurement
techniques to be applied when declaring performance parameters. The use of these
techniques will enhance the ability of the system integrator to integrate IEDs easily, operate
IEDs correctly, and support the applications as intended.
NOTE The role of the test facilities for conformance testing and certifying the results is beyond the scope of this
part of IEC 61850.
2 Normative references
The following documents, in whole or in part, are normatively referenced in this document and
are indispensable for its application. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document (including any
amendments) applies.
IEC 61850-2, Communication networks and systems for power utility automation – Part 2:
Glossary
IEC 61850-3, Communication networks and systems for power utility automation – Part 3:
General requirements
IEC 61850-4:2011, Communication networks and systems for power utility automation –
Part 4: System and project management
IEC 61850-5:2003, Communication networks and systems for power utility automation –
Part 5: Communication requirements for functions and devices models
IEC 61850-6:2009, Communication networks and systems for power utility automation –
Part 6: Configuration description language for communication in electrical substations related
to IEDs
IEC 61850-7-1:2011, Communication networks and systems for power utility automation –
Part 7-1: Basic communication structure – Principles and models
IEC 61850-7-2:2010, Communication networks and systems for power utility automation –
Part 7-2: Basic information and communication structure – Abstract communication service
interface (ACSI)
IEC 61850-7-3:2010, Communication networks and systems for power utility automation –
Part 7-3: Basic communication structure – Common data classes
IEC 61850-7-4:2011, Communication networks and systems for power utility automation –
Part 7-4: Basic communication structure – Compatible logical node classes and data object
classes
– 10 – 61850-10 © IEC:2012
IEC 61850-8-1:2011, Communication networks and systems for power utility automation –
Part 8-1: Specific communication service mapping (SCSM) – Mappings to MMS
(ISO/IEC 9506-1 and ISO/IEC 9506-2) and to ISO/IEC 8802-3
IEC 61850-9-2:2011, Communication networks and systems for power utility automation –
Part 9-2: Specific Communication Service Mapping (SCSM) – Sampled values over
ISO/IEC 8802-3
IEC 62439-3:2012, Industrial communication networks – High availability automation networks
– Part 3: Parallel Redundancy Protocol (PRP) and High Availability Seamless Redundancy
(HSR)
ISO/IEC 9646 (all parts), Information technology – Open Systems Interconnection –
Conformance testing methodology and framework
ISO 9001 (all parts), Quality management systems
ISO 9506 (all parts), Industrial automation systems – Manufacturing Message Specification
IEEE 1588:2008, Standard for a precision clock synchronization protocol for networked
measurement and control systems
3 Terms and definitions
For the purposes of this document, the terms and definitions given in IEC 61850-2 and the
following apply.
3.1
factory acceptance test
FAT
customer-agreed functional tests of the specifically manufactured power utility automation
system or its parts using the parameter set for the planned application as specified in a
specific customer specification
Note 1 to entry: The FAT will be carried out in the factory of the manufacturer or other agreed-upon location by
the use of process simulating test equipment.
3.2
hold point
point, defined in the appropriate document beyond which an activity shall not proceed without
the approval of the initiator of the conformance test
Note 1 to entry: The test facility shall provide a written notice to the initiator at an agreed time prior to the hold
point. The initiator or his representative is obligated to verify the hold point and approve the proceeding of the
activity.
3.3
interoperability
ability of two or more IEDs from the same vendor (or different vendors) to exchange
information and use that information for correct co-operation.
Set of values having defined correspondence with the quantities or values of another set
3.4
model implementation conformance statement
MICS
statement that details the standard data object model elements supported by the system or
device
61850-10 © IEC:2012 – 11 –
3.5
negative test
test to verify the correct response of a system or a device when subjected to:
– IEC 61850 series conformant information and services which are not implemented in the
system or device under test;
– non IEC 61850 series conformant information and services sent to the system or device
under test
3.6
protocol implementation conformance statement
PICS
statement with the summary of the communication capabilities of the system or device to be
tested
3.7
protocol implementation extra Information for testing
PIXIT
statement with system or device specific information regarding the communication capabilities
of the system or device to be tested and which are outside the scope of the IEC 61850 series.
The PIXIT is not subject to standardisation.
3.8
routine test
performed by the manufacturer in order to ensure device operation and safety
3.9
site acceptance test
SAT
verification of each data and control point and the correct functionality within the PUAS and
between the PUAS and its operating environment at the whole installed plant by use of the
final parameter set as specified in a specific customer specification
Note 1 to entry: The SAT is the precondition for the power utility automation system (PUAS) being put into
operation.
3.10
SCL implementation conformance statement
SICS
statement with the summary of the capabilities of the SCL engineering tool
3.11
system related test
verification of correct behaviour of the IEDs and of the overall PUAS under specific
application conditions
Note 1 to entry: The system related test is part of the final stage of the development of IEDs as belonging to a
PUAS-product family.
3.12
test equipment
all tools and instruments which simulate and verify the input/outputs of the operating
environment of the PUAS such as switchgear, transformers, network control centres or
connected telecommunication units on the one side, and the serial links between the IEDs of
the PUAS on the other
3.13
test facility
organisation able to provide appropriate test equipment and trained staff for conformance
testing
– 12 – 61850-10 © IEC:2012
Note 1 to entry: The management of conformance tests and the resulting information should follow a quality
system.
3.14
technical issues conformance statement
TICS
statement with device specific information regarding the implemented technical issues
detected after publication of the standard. The TICS is not subject to standardisation.
3.15
type test
verification of correct behaviour of the IEDs of the PUAS by use of the system tested software
under the test conditions corresponding with the technical data
Note 1 to entry: The type test marks the final stage of the hardware development and is the precondition for the
start of the production. This test is carried out with IEDs, which have been manufactured through the normal
production cycle.
3.16
witness point
point, defined in the appropriate document, at which an inspection will take place on an
activity
Note 1 to entry: The activity may proceed without the approval of the initiator of the conformance test. The test
facility provides a written notice to the initiator at an agreed time prior to the witness point. The initiator or his
representative has the right, but is not obligated, to verify the witness point.
4 Abbreviated terms
ACSI abstract communication service interface
BRCB buffered report control block
CDC common data class
DUT device under test
FAT factory acceptance test
GI general interrogation
GoCB GOOSE control block
GOOSE generic object oriented substation events
HMI human machine interface
HSR high availability seamless ring
ICD IED capability description
IED intelligent electronic device
IID instantiated IED description
IP internet protocol
LCB log control block
LD logical device
LN logical node
MICS model implementation conformance statement
MMS manufacturing message specification (ISO 9506 series)
MSVCB multicast sampled value control block
PICS protocol implementation conformance statement
PIXIT protocol implementation extra information for testing
PPS pulse per second
61850-10 © IEC:2012 – 13 –
PRP parallel redundancy protocol
PUAS power utility automation system
SAT site acceptance test
SAV sampled analogue values (IEC 61850-9-2)
SCD substation configuration description
SCL substation configuration language
SCSM specific communication service mapping
SGCB setting group control block
SICS SCL implementation conformance statement
SNTP simple network time protocol
SSD system specification description
SV sampled values
SVCB sampled values control block
TCP transport control protocol
TICS technical issues conformance statement
TPAA two party application association
TUT tool under test
URCB unbuffered report control block
USVCB unicast sampled values control block
UTC coordinated universal time
XML extensible markup language

5 Introduction to conformance testing
5.1 General
There are many steps involved from the
...