This document provides guidance for work breakdown structures for organizations undertaking project or programme management. It is applicable to any type of organization including public or private and any size of organization or sector, as well as any type of project and programme in terms of complexity, size or duration. This document provides relevant terms and definitions, concepts, characteristics, benefits, uses, integration and relationships related to work breakdown structures. It does not provide guidance on the use of processes, methods or tools in the practice of developing and using a work breakdown structure. Annexes A and B provide examples of work breakdown structures and relationships to other breakdown structures.
- Status
- Published
- Publication Date
- 23-May-2018
- Technical Committee
- ISO/TC 258 - Project, programme and portfolio management
- Drafting Committee
- ISO/TC 258 - Project, programme and portfolio management
- Current Stage
- 9092 - International Standard to be revised
- Start Date
- 29-Sep-2023
- Completion Date
- 29-Aug-2026
Buy Documents
ISO 21511:2018 - Work breakdown structures for project and programme management
ISO 21511:2018 - Work breakdown structures for project and programme management/24/2018
ISO 21511:2018 - Organigramme des tâches en management de projet et de programme
ISO 21511:2018 - Organigramme des tâches en management de projet et de programme/24/2018
Overview
ISO 21511:2018 - "Work breakdown structures for project and programme management" provides guidance on developing and using a work breakdown structure (WBS) across projects and programmes. Applicable to any organization (public or private), any sector and any size of project or programme, the standard defines relevant terms and concepts, explains WBS characteristics and composition, and describes relationships between WBS and other breakdown structures. It does not prescribe specific processes, methods or software tools for WBS creation. Annex A and B include illustrative examples and relationship mappings.
Key topics and technical requirements
- Definitions and terminology: clear definitions (e.g., 100% rule, WBS element, WBS dictionary, progressive elaboration).
- Hierarchical decomposition: guidance on creating a hierarchical WBS that decomposes the entire scope into progressively lower-level elements so each parent’s children together represent 100% of the parent’s work.
- Parent–child relationships: conventions for logical hierarchy and aggregation of scope across levels.
- Progressive elaboration and rolling-wave planning: handling evolving scope by reflecting the known 100% of work at the time of WBS development and updating as scope becomes defined.
- WBS composition and dictionary: expectations for describing WBS elements and assembling a WBS dictionary to document scope, responsibilities and attributes.
- Integration with other breakdown structures: relationships to organizational breakdown structure, product breakdown structure, resource breakdown structure, contracts and functional areas.
- Control, uses and benefits: how WBS supports planning, scope control, communication, performance reporting and cross-project analysis.
- Informative annexes: Annex A (WBS examples) and Annex B (links to other structures).
Practical applications - who uses ISO 21511:2018
ISO 21511:2018 is useful for:
- Project and programme managers who need a consistent framework for scope decomposition and control.
- Sponsors and senior managers to understand scope and benefits reporting.
- PMO staff and project controllers for aligning schedules, cost and resources to WBS elements.
- Contract managers and procurement teams linking deliverables to contractual packages.
- Standards developers and trainers who create organizational guidance on WBS practice.
Practical benefits include improved scope clarity, standardized communication across stakeholders, easier alignment of schedule and cost to deliverables, and better aggregation of performance data for portfolio analysis.
Related standards
- ISO 21500 (guidance on project management)
- ISO 21504 (portfolio management) ISO 21511 complements these standards by focusing specifically on the structure and semantics of the work breakdown structure used in project and programme management.
Buy Documents
ISO 21511:2018 - Work breakdown structures for project and programme management
ISO 21511:2018 - Work breakdown structures for project and programme management/24/2018
ISO 21511:2018 - Organigramme des tâches en management de projet et de programme
ISO 21511:2018 - Organigramme des tâches en management de projet et de programme/24/2018
Get Certified
Connect with accredited certification bodies for this standard

BSI Group
BSI (British Standards Institution) is the business standards company that helps organizations make excellence a habit.

Bureau Veritas
Bureau Veritas is a world leader in laboratory testing, inspection and certification services.

DNV
DNV is an independent assurance and risk management provider.
Sponsored listings
Frequently Asked Questions
ISO 21511:2018 is a standard published by the International Organization for Standardization (ISO). Its full title is "Work breakdown structures for project and programme management". This standard covers: This document provides guidance for work breakdown structures for organizations undertaking project or programme management. It is applicable to any type of organization including public or private and any size of organization or sector, as well as any type of project and programme in terms of complexity, size or duration. This document provides relevant terms and definitions, concepts, characteristics, benefits, uses, integration and relationships related to work breakdown structures. It does not provide guidance on the use of processes, methods or tools in the practice of developing and using a work breakdown structure. Annexes A and B provide examples of work breakdown structures and relationships to other breakdown structures.
This document provides guidance for work breakdown structures for organizations undertaking project or programme management. It is applicable to any type of organization including public or private and any size of organization or sector, as well as any type of project and programme in terms of complexity, size or duration. This document provides relevant terms and definitions, concepts, characteristics, benefits, uses, integration and relationships related to work breakdown structures. It does not provide guidance on the use of processes, methods or tools in the practice of developing and using a work breakdown structure. Annexes A and B provide examples of work breakdown structures and relationships to other breakdown structures.
ISO 21511:2018 is classified under the following ICS (International Classification for Standards) categories: 03.100.40 - Research and development. The ICS classification helps identify the subject area and facilitates finding related standards.
ISO 21511:2018 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.
Standards Content (Sample)
INTERNATIONAL ISO
STANDARD 21511
First edition
2018-05
Work breakdown structures for
project and programme management
Organigramme des tâches en management de projet et de programme
Reference number
©
ISO 2018
© ISO 2018
All rights reserved. Unless otherwise specified, or required in the context of its implementation, no part of this publication may
be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting
on the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address
below or ISO’s member body in the country of the requester.
ISO copyright office
CP 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Phone: +41 22 749 01 11
Fax: +41 22 749 09 47
Email: copyright@iso.org
Website: www.iso.org
Published in Switzerland
ii © ISO 2018 – All rights reserved
Contents Page
Foreword .iv
Introduction .v
1 Scope . 1
2 Normative references . 1
3 Terms and definitions . 1
4 Work breakdown structure concepts . 3
4.1 General . 3
4.2 Purpose . 3
4.3 Context . 3
4.4 Hierarchical decomposition. 4
4.5 Parent–child relationships . 4
4.6 Progressive elaboration . 4
5 Work breakdown structure characteristics, development and relationships to other
structures . 5
5.1 Characteristics of a work breakdown structure . 5
5.2 Development . 5
5.2.1 General. 5
5.2.2 Creation . 6
5.2.3 Description of the project or programme work breakdown structure elements . 6
5.2.4 Composition of the work breakdown structure dictionary . 7
5.2.5 Integration of multiple work breakdown structures. 7
5.3 Work breakdown structure relationships . 8
5.3.1 General. 8
5.3.2 Relationship to organizational breakdown structure . 8
5.3.3 Relationship to contracts . 8
5.3.4 Relationship to functional areas . 8
5.3.5 Relationship to other structures . 9
5.4 Control of work breakdown structure . 9
5.5 Uses and benefits of the work breakdown structure . 9
5.5.1 Uses of the work breakdown structure . 9
5.5.2 Benefits from the work breakdown structure .10
Annex A (informative) Work breakdown structures — Examples .11
Annex B (informative) Links with other breakdown structures — Examples .18
Annex C (informative) Alternatives hierarchical work breakdown structures .21
Bibliography .23
Foreword
ISO (the International Organization for Standardization) is a worldwide federation of national standards
bodies (ISO member bodies). The work of preparing International Standards is normally carried out
through ISO technical committees. Each member body interested in a subject for which a technical
committee has been established has the right to be represented on that committee. International
organizations, governmental and non-governmental, in liaison with ISO, also take part in the work.
ISO collaborates closely with the International Electrotechnical Commission (IEC) on all matters of
electrotechnical standardization.
The procedures used to develop this document and those intended for its further maintenance are
described in the ISO/IEC Directives, Part 1. In particular the different approval criteria needed for the
different types of ISO documents should be noted. This document was drafted in accordance with the
editorial rules of the ISO/IEC Directives, Part 2 (see www .iso .org/directives).
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. ISO shall not be held responsible for identifying any or all such patent rights. Details of
any patent rights identified during the development of the document will be in the Introduction and/or
on the ISO list of patent declarations received (see www .iso .org/patents).
Any trade name used in this document is information given for the convenience of users and does not
constitute an endorsement.
For an explanation on the voluntary nature of standards, the meaning of ISO specific terms and
expressions related to conformity assessment, as well as information about ISO's adherence to the
World Trade Organization (WTO) principles in the Technical Barriers to Trade (TBT) see the following
URL: www .iso .org/iso/foreword .html.
This document was prepared by Technical Committee ISO/TC 258, Project, programme and portfolio
management.
iv © ISO 2018 – All rights reserved
Introduction
The purpose of this document is to provide guidance on work breakdown structure for those individuals
working in project and programme management, and who are involved in developing and using a
work breakdown structure. This document incorporates practices to provide benefits for project or
programme planning and control, and provides guidance on work breakdown structure concepts,
composition and relationships with other structures.
It complements ISO 21500 and ISO 21504.
The target audience of this document includes, but is not limited to, the following:
a) managers and those individuals involved in sponsoring projects or programmes;
b) individuals managing projects or programmes and work breakdown structure practises;
c) individuals involved in the management of or performance of project management offices of project
or programme control staff;
d) developers of national or organizational standards.
The application of this document may be tailored to meet the needs of any organization or individual,
so they may better apply the concepts, requirements and practice of developing and using work
breakdown structures.
INTERNATIONAL STANDARD ISO 21511:2018(E)
Work breakdown structures for project and programme
management
1 Scope
This document provides guidance for work breakdown structures for organizations undertaking
project or programme management. It is applicable to any type of organization including public or
private and any size of organization or sector, as well as any type of project and programme in terms of
complexity, size or duration.
This document provides relevant terms and definitions, concepts, characteristics, benefits, uses,
integration and relationships related to work breakdown structures. It does not provide guidance
on the use of processes, methods or tools in the practice of developing and using a work breakdown
structure.
Annexes A and B provide examples of work breakdown structures and relationships to other breakdown
structures.
2 Normative references
There are no normative references in this document.
3 Terms and definitions
For the purposes of this document, the following terms and definitions apply.
ISO and IEC maintain terminological databases for use in standardization at the following addresses:
— IEC Electropedia: available at https: //www .electropedia .org/
— ISO Online browsing platform: available at https: //www .iso .org/obp
3.1
100 % rule
concept concerning the entire work required to be accomplished to achieve the project or programme
scope captured in the work breakdown structure (3.13)
Note 1 to entry: The 100 % rule applies to the parent and child elements. The child level of decomposition of a
work breakdown structure element represents 100 % of the work applicable to the parent level.
3.2
functional breakdown structure
decomposition of the functions necessary to perform the work elements of a project or programme
3.3
hierarchical decomposition
process of dividing project or programme scope into successively smaller work breakdown structure
elements (3.15)
3.4
management information system
hardware and software used to support the compilation of information, analysis and reporting of
project and programme metrics
3.5
organizational breakdown structure
decomposition of the management team of an organization, or decomposition of the management team
that performs the work of a project or programme
Note 1 to entry: The organizational breakdown structure can include partnering or subcontracting. It is used
to illustrate the relationship between project and programme activities and the organizational units that will
manage or perform the work activities.
3.6
parent element
work that is decomposed into two or more lower level elements of work
Note 1 to entry: The lower elements of work are called child elements.
3.7
product breakdown structure
decomposition of the product into its components
3.8
progressive elaboration
iterative process to incorporate increased level of details identified during the life cycle of a project or
programme
Note 1 to entry: Also known as progressive decomposition.
3.9
resource breakdown structure
decomposition of personnel, equipment, material or other assets
3.10
responsibility assignment matrix
documented structure that shows the allocation of delegated work responsibilities designated for
delivery of scope or benefits
3.11
risk breakdown structure
decomposition of threats and opportunities for project or programme
3.12
rolling wave planning
form of progressive elaboration (3.8) where planning is accomplished in phases or time periods
3.13
work breakdown structure
decomposition of the defined scope of the project or programme into progressively lower levels
consisting of elements of work
3.14
work breakdown structure dictionary
document that describes each element in the work breakdown structure (3.13)
3.15
work breakdown structure element
work at a designated level that is either a parent or a child
2 © ISO 2018 – All rights reserved
4 Work breakdown structure concepts
4.1 General
A work breakdown structure is a decomposition of the entire scope of work that should be completed
in order to achieve the project or programme objectives. The work breakdown structure is used
throughout the project or programme, to establish the framework for the management of the work.
The structure should provide a logical framework for decomposing 100 % of the work defined by the
project or programme scope.
NOTE Currently, most work breakdown structures are hierarchical, and this document will focus on this
type of structure. New software models are presenting options to the hierarchical decomposition structure. See
Annex C.
Each descending level of the work breakdown structure should provide a more detailed definition of
the work. Work may be product-oriented, deliverable-oriented or result-oriented; and, additionally,
may be focused on project or programme phases, disciplines or locations. The entire scope of work of
the project or programme should include work to be done by the project or programme management
team or team members; subcontractors; and other stakeholders.
4.2 Purpose
The purpose of using a work breakdown structure should be to enhance and support the management
of a project or a programme by enabling, but not limited to, the following:
a) planning of the project or programme;
b) decomposition of the scope of the project or programme into smaller elements of work to enable
the management and control of the project or programme scope, resources and time;
c) enhancement of project or programme communication by providing a common framework for
stakeholders to use when describing and analysing the scope and performance of the project or
programme;
d) communication on the benefits resulting from various project or programme elements;
e) summarization of project performance data for strategic level reporting;
f) performance analysis across projects or programmes for particular work breakdown structure
elements with common identifiable characteristics, such as codes, to allow identification of areas of
concern and opportunities for improvement; and,
g) alignment of tasks and activities of the schedule to the work breakdown structure elements.
NOTE A work breakdown structure can in some cases be referred to as product breakdown structure, which
can have additional restrictions in its use. A product breakdown structure generally describes the resulting
output of a project, but can also refer to an existing product and its hierarchal breakdown of elements. The use of
the term can vary from one organization to another organization.
4.3 Context
The work breakdown structure is a flexible concept, and its design and overall structure should be
adapted to the requirements of the project or programme. The work breakdown structure should be
dependent on the industry, type of project or programme, and other factors such as project phases,
major deliverables, scope, organization performing the work, and location of resources. The work
breakdown structure should be flexible enough to accommodate alternative ways of organizing and
representing the work.
4.4 Hierarchical decomposition
The work breakdown structure should provide a hierarchical decomposition of elements to the level
necessary to plan and manage the work to meet the project or programme objectives.
The hierarchical decomposition should include 100 % of the work contained in the scope of the project
or programme. Where an element is decomposed to child elements, the aggregate of work defined
by the lower level elements should represent 100 % of the work contained in the parent element.
The parent–child convention describes a relationship with a hierarchy in which a single element may
simultaneously be the parent of a number of child elements and the child of a higher-level element.
Within a programme, the projects, other programmes and other related work should be decomposed
in a similar manner. The programme becomes the highest level of the work breakdown structure. The
same parent–child convention should apply to the logical relationships in the hierarchy. Each project,
programme or other related work element under a programme may develop a stand-alone work
breakdown structure that may be represented as a separate work breakdown structure or as part of
the combined programme work breakdown structure.
Some projects or programmes may not have a fixed scope; therefore, any unknown or undefined scope
will not be included in the work breakdown structure. These projects may use agile, progressive
elaboration, or rolling wave planning techniques, where the scope is defined as the project progresses.
In this case, the work breakdown structure represents 100 % of the scope of work known at the time of
development of the work breakdown structure. As changes of scope are identified during the life of the
project or programme, the identified scope should be taken into account within the work breakdown
structure, while maintaining the logic flow of the levels of the work breakdown structure and the
parent–child relationship.
4.5 Parent–child relationships
There are various options to create parent–child relationships, depending on the type of project or
programme and the work breakdown structure developed. There are different ways of representing
scope, which means that there are various options for developing the structure of the work breakdown
structure. The following is a non-exclusive list of parent–child relationships.
a) Child elements belong to the parent element. The relationship reflects the final segment of the
output, product or result of the project or programme that may be physical or conceptual.
b) Child elements belong to a category defined by the parent. Categories may be based on time, phase,
relationship, location, priority or discipline.
c) Child elements are part of the same state described by the parent. States may be interim versions of
the product, such as drafts, preliminary, prototype, mock up or final versions.
d) Child elements are products or services needed to complete the parent. These products or services
may include tools, prerequisite products or services, or documentation on procurement, contracts,
engineering, construction, commissioning, and project or programme management.
e) Child elements are objectives needed to complete the parent. These child elements may refer to the
project or programme objectives, change of behaviours or impact of organizational change.
These parent–child relationships may be combined to create a comprehensive decomposition of the
scope of the project or programme into the work breakdown structure.
4.6 Progressive elaboration
Progressive elaboration is especially useful when the detailed scope is unknown, undefined or subject
to change. Such progressive addition of detail to the work breakdown structure should produce a more
accurate work breakdown structure and enhance the use of the structure to manage the project or
programme. Progressive elaboration may entail one, concurrent or successive modifications to the work
breakdown structure. Rolling wave planning is a form of progressive elaboration that is time-based.
4 © ISO 2018 – All rights reserved
5 Work breakdown structure characteristics, development and relationships to
other structures
5.1 Characteristics of a work breakdown structure
The characteristics of a work breakdown structure should be related to the scope of the project
or programme for which it is being composed. The following are typical characteristics of a work
breakdown structure.
a) A work breakdown structure may be represented by a variety of formats. The most common
formats for a work breakdown structure are graphical, outline and tabular.
b) Not all elements of the work breakdown structure need to be decomposed to the same level, but
should be decomposed to the level needed to manage the project or programme component.
c) Each work breakdown structure element may be assigned to one person, entity or function to be
responsible.
d) A work breakdown structure should reflect the technical complexity, size and other information, as
deemed necessary for the scope.
e) A work breakdown structure defines the structure of the work and not the processes involved in
accomplishing the work.
f) A work breakdown structure should provide a hierarchical decomposition of elements, applying the
100 % rule, to the level necessary to plan and manage the work to satisfy the project or programme
objectives.
g) The content of the elements into which the scope is decomposed may be related to, but not limited
to, considerations such as industry standards, organizational procedures, or contract terms and
conditions.
h) Each element on the work breakdown structure should be assigned a unique identifier to
distinguish one element from another.
The 100 % rule should provide that if one can associate a work breakdown structure child element with
its parent element, it should be included with the associated parent element in the work breakdown
structure. Each parent element may have zero child elements or at least two child elements.
The work breakdown structure should represent collective inputs of the project or programme team
and relevant stakeholders. The work breakdown structure should be an agreed upon decomposition
of the work to be performed by the project or programme management team. Each change made to
the work breakdown structure should also be reviewed with the project or programme management
team and the identified performing organization and performers within that organization and relevant
stakeholders.
Examples of work breakdown structures can be found in Annexes A and B.
5.2 Development
5.2.1 General
The work breakdown structure should be developed early in a project or programme. Depending upon
the project or programme, a conceptual work breakdown structure may be created during the business
case process, which may be re-evaluated or further decomposed once the project or programme is
authorized. Once developed, the work breakdown structure:
a) may provide a basis for gathering cost data across projects and programmes and may correlate
with the cost management system,
b) should serve to maintain the breakdown of the scope,
c) should allow for project and programme status to be continuously visible and in
...
INTERNATIONAL ISO
STANDARD 21511
First edition
2018-05
Work breakdown structures for
project and programme management
Organigramme des tâches en management de projet et de programme
Reference number
©
ISO 2018
© ISO 2018
All rights reserved. Unless otherwise specified, or required in the context of its implementation, no part of this publication may
be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting
on the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address
below or ISO’s member body in the country of the requester.
ISO copyright office
CP 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Phone: +41 22 749 01 11
Fax: +41 22 749 09 47
Email: copyright@iso.org
Website: www.iso.org
Published in Switzerland
ii © ISO 2018 – All rights reserved
Contents Page
Foreword .iv
Introduction .v
1 Scope . 1
2 Normative references . 1
3 Terms and definitions . 1
4 Work breakdown structure concepts . 3
4.1 General . 3
4.2 Purpose . 3
4.3 Context . 3
4.4 Hierarchical decomposition. 4
4.5 Parent–child relationships . 4
4.6 Progressive elaboration . 4
5 Work breakdown structure characteristics, development and relationships to other
structures . 5
5.1 Characteristics of a work breakdown structure . 5
5.2 Development . 5
5.2.1 General. 5
5.2.2 Creation . 6
5.2.3 Description of the project or programme work breakdown structure elements . 6
5.2.4 Composition of the work breakdown structure dictionary . 7
5.2.5 Integration of multiple work breakdown structures. 7
5.3 Work breakdown structure relationships . 8
5.3.1 General. 8
5.3.2 Relationship to organizational breakdown structure . 8
5.3.3 Relationship to contracts . 8
5.3.4 Relationship to functional areas . 8
5.3.5 Relationship to other structures . 9
5.4 Control of work breakdown structure . 9
5.5 Uses and benefits of the work breakdown structure . 9
5.5.1 Uses of the work breakdown structure . 9
5.5.2 Benefits from the work breakdown structure .10
Annex A (informative) Work breakdown structures — Examples .11
Annex B (informative) Links with other breakdown structures — Examples .18
Annex C (informative) Alternatives hierarchical work breakdown structures .21
Bibliography .23
Foreword
ISO (the International Organization for Standardization) is a worldwide federation of national standards
bodies (ISO member bodies). The work of preparing International Standards is normally carried out
through ISO technical committees. Each member body interested in a subject for which a technical
committee has been established has the right to be represented on that committee. International
organizations, governmental and non-governmental, in liaison with ISO, also take part in the work.
ISO collaborates closely with the International Electrotechnical Commission (IEC) on all matters of
electrotechnical standardization.
The procedures used to develop this document and those intended for its further maintenance are
described in the ISO/IEC Directives, Part 1. In particular the different approval criteria needed for the
different types of ISO documents should be noted. This document was drafted in accordance with the
editorial rules of the ISO/IEC Directives, Part 2 (see www .iso .org/directives).
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. ISO shall not be held responsible for identifying any or all such patent rights. Details of
any patent rights identified during the development of the document will be in the Introduction and/or
on the ISO list of patent declarations received (see www .iso .org/patents).
Any trade name used in this document is information given for the convenience of users and does not
constitute an endorsement.
For an explanation on the voluntary nature of standards, the meaning of ISO specific terms and
expressions related to conformity assessment, as well as information about ISO's adherence to the
World Trade Organization (WTO) principles in the Technical Barriers to Trade (TBT) see the following
URL: www .iso .org/iso/foreword .html.
This document was prepared by Technical Committee ISO/TC 258, Project, programme and portfolio
management.
iv © ISO 2018 – All rights reserved
Introduction
The purpose of this document is to provide guidance on work breakdown structure for those individuals
working in project and programme management, and who are involved in developing and using a
work breakdown structure. This document incorporates practices to provide benefits for project or
programme planning and control, and provides guidance on work breakdown structure concepts,
composition and relationships with other structures.
It complements ISO 21500 and ISO 21504.
The target audience of this document includes, but is not limited to, the following:
a) managers and those individuals involved in sponsoring projects or programmes;
b) individuals managing projects or programmes and work breakdown structure practises;
c) individuals involved in the management of or performance of project management offices of project
or programme control staff;
d) developers of national or organizational standards.
The application of this document may be tailored to meet the needs of any organization or individual,
so they may better apply the concepts, requirements and practice of developing and using work
breakdown structures.
INTERNATIONAL STANDARD ISO 21511:2018(E)
Work breakdown structures for project and programme
management
1 Scope
This document provides guidance for work breakdown structures for organizations undertaking
project or programme management. It is applicable to any type of organization including public or
private and any size of organization or sector, as well as any type of project and programme in terms of
complexity, size or duration.
This document provides relevant terms and definitions, concepts, characteristics, benefits, uses,
integration and relationships related to work breakdown structures. It does not provide guidance
on the use of processes, methods or tools in the practice of developing and using a work breakdown
structure.
Annexes A and B provide examples of work breakdown structures and relationships to other breakdown
structures.
2 Normative references
There are no normative references in this document.
3 Terms and definitions
For the purposes of this document, the following terms and definitions apply.
ISO and IEC maintain terminological databases for use in standardization at the following addresses:
— IEC Electropedia: available at https: //www .electropedia .org/
— ISO Online browsing platform: available at https: //www .iso .org/obp
3.1
100 % rule
concept concerning the entire work required to be accomplished to achieve the project or programme
scope captured in the work breakdown structure (3.13)
Note 1 to entry: The 100 % rule applies to the parent and child elements. The child level of decomposition of a
work breakdown structure element represents 100 % of the work applicable to the parent level.
3.2
functional breakdown structure
decomposition of the functions necessary to perform the work elements of a project or programme
3.3
hierarchical decomposition
process of dividing project or programme scope into successively smaller work breakdown structure
elements (3.15)
3.4
management information system
hardware and software used to support the compilation of information, analysis and reporting of
project and programme metrics
3.5
organizational breakdown structure
decomposition of the management team of an organization, or decomposition of the management team
that performs the work of a project or programme
Note 1 to entry: The organizational breakdown structure can include partnering or subcontracting. It is used
to illustrate the relationship between project and programme activities and the organizational units that will
manage or perform the work activities.
3.6
parent element
work that is decomposed into two or more lower level elements of work
Note 1 to entry: The lower elements of work are called child elements.
3.7
product breakdown structure
decomposition of the product into its components
3.8
progressive elaboration
iterative process to incorporate increased level of details identified during the life cycle of a project or
programme
Note 1 to entry: Also known as progressive decomposition.
3.9
resource breakdown structure
decomposition of personnel, equipment, material or other assets
3.10
responsibility assignment matrix
documented structure that shows the allocation of delegated work responsibilities designated for
delivery of scope or benefits
3.11
risk breakdown structure
decomposition of threats and opportunities for project or programme
3.12
rolling wave planning
form of progressive elaboration (3.8) where planning is accomplished in phases or time periods
3.13
work breakdown structure
decomposition of the defined scope of the project or programme into progressively lower levels
consisting of elements of work
3.14
work breakdown structure dictionary
document that describes each element in the work breakdown structure (3.13)
3.15
work breakdown structure element
work at a designated level that is either a parent or a child
2 © ISO 2018 – All rights reserved
4 Work breakdown structure concepts
4.1 General
A work breakdown structure is a decomposition of the entire scope of work that should be completed
in order to achieve the project or programme objectives. The work breakdown structure is used
throughout the project or programme, to establish the framework for the management of the work.
The structure should provide a logical framework for decomposing 100 % of the work defined by the
project or programme scope.
NOTE Currently, most work breakdown structures are hierarchical, and this document will focus on this
type of structure. New software models are presenting options to the hierarchical decomposition structure. See
Annex C.
Each descending level of the work breakdown structure should provide a more detailed definition of
the work. Work may be product-oriented, deliverable-oriented or result-oriented; and, additionally,
may be focused on project or programme phases, disciplines or locations. The entire scope of work of
the project or programme should include work to be done by the project or programme management
team or team members; subcontractors; and other stakeholders.
4.2 Purpose
The purpose of using a work breakdown structure should be to enhance and support the management
of a project or a programme by enabling, but not limited to, the following:
a) planning of the project or programme;
b) decomposition of the scope of the project or programme into smaller elements of work to enable
the management and control of the project or programme scope, resources and time;
c) enhancement of project or programme communication by providing a common framework for
stakeholders to use when describing and analysing the scope and performance of the project or
programme;
d) communication on the benefits resulting from various project or programme elements;
e) summarization of project performance data for strategic level reporting;
f) performance analysis across projects or programmes for particular work breakdown structure
elements with common identifiable characteristics, such as codes, to allow identification of areas of
concern and opportunities for improvement; and,
g) alignment of tasks and activities of the schedule to the work breakdown structure elements.
NOTE A work breakdown structure can in some cases be referred to as product breakdown structure, which
can have additional restrictions in its use. A product breakdown structure generally describes the resulting
output of a project, but can also refer to an existing product and its hierarchal breakdown of elements. The use of
the term can vary from one organization to another organization.
4.3 Context
The work breakdown structure is a flexible concept, and its design and overall structure should be
adapted to the requirements of the project or programme. The work breakdown structure should be
dependent on the industry, type of project or programme, and other factors such as project phases,
major deliverables, scope, organization performing the work, and location of resources. The work
breakdown structure should be flexible enough to accommodate alternative ways of organizing and
representing the work.
4.4 Hierarchical decomposition
The work breakdown structure should provide a hierarchical decomposition of elements to the level
necessary to plan and manage the work to meet the project or programme objectives.
The hierarchical decomposition should include 100 % of the work contained in the scope of the project
or programme. Where an element is decomposed to child elements, the aggregate of work defined
by the lower level elements should represent 100 % of the work contained in the parent element.
The parent–child convention describes a relationship with a hierarchy in which a single element may
simultaneously be the parent of a number of child elements and the child of a higher-level element.
Within a programme, the projects, other programmes and other related work should be decomposed
in a similar manner. The programme becomes the highest level of the work breakdown structure. The
same parent–child convention should apply to the logical relationships in the hierarchy. Each project,
programme or other related work element under a programme may develop a stand-alone work
breakdown structure that may be represented as a separate work breakdown structure or as part of
the combined programme work breakdown structure.
Some projects or programmes may not have a fixed scope; therefore, any unknown or undefined scope
will not be included in the work breakdown structure. These projects may use agile, progressive
elaboration, or rolling wave planning techniques, where the scope is defined as the project progresses.
In this case, the work breakdown structure represents 100 % of the scope of work known at the time of
development of the work breakdown structure. As changes of scope are identified during the life of the
project or programme, the identified scope should be taken into account within the work breakdown
structure, while maintaining the logic flow of the levels of the work breakdown structure and the
parent–child relationship.
4.5 Parent–child relationships
There are various options to create parent–child relationships, depending on the type of project or
programme and the work breakdown structure developed. There are different ways of representing
scope, which means that there are various options for developing the structure of the work breakdown
structure. The following is a non-exclusive list of parent–child relationships.
a) Child elements belong to the parent element. The relationship reflects the final segment of the
output, product or result of the project or programme that may be physical or conceptual.
b) Child elements belong to a category defined by the parent. Categories may be based on time, phase,
relationship, location, priority or discipline.
c) Child elements are part of the same state described by the parent. States may be interim versions of
the product, such as drafts, preliminary, prototype, mock up or final versions.
d) Child elements are products or services needed to complete the parent. These products or services
may include tools, prerequisite products or services, or documentation on procurement, contracts,
engineering, construction, commissioning, and project or programme management.
e) Child elements are objectives needed to complete the parent. These child elements may refer to the
project or programme objectives, change of behaviours or impact of organizational change.
These parent–child relationships may be combined to create a comprehensive decomposition of the
scope of the project or programme into the work breakdown structure.
4.6 Progressive elaboration
Progressive elaboration is especially useful when the detailed scope is unknown, undefined or subject
to change. Such progressive addition of detail to the work breakdown structure should produce a more
accurate work breakdown structure and enhance the use of the structure to manage the project or
programme. Progressive elaboration may entail one, concurrent or successive modifications to the work
breakdown structure. Rolling wave planning is a form of progressive elaboration that is time-based.
4 © ISO 2018 – All rights reserved
5 Work breakdown structure characteristics, development and relationships to
other structures
5.1 Characteristics of a work breakdown structure
The characteristics of a work breakdown structure should be related to the scope of the project
or programme for which it is being composed. The following are typical characteristics of a work
breakdown structure.
a) A work breakdown structure may be represented by a variety of formats. The most common
formats for a work breakdown structure are graphical, outline and tabular.
b) Not all elements of the work breakdown structure need to be decomposed to the same level, but
should be decomposed to the level needed to manage the project or programme component.
c) Each work breakdown structure element may be assigned to one person, entity or function to be
responsible.
d) A work breakdown structure should reflect the technical complexity, size and other information, as
deemed necessary for the scope.
e) A work breakdown structure defines the structure of the work and not the processes involved in
accomplishing the work.
f) A work breakdown structure should provide a hierarchical decomposition of elements, applying the
100 % rule, to the level necessary to plan and manage the work to satisfy the project or programme
objectives.
g) The content of the elements into which the scope is decomposed may be related to, but not limited
to, considerations such as industry standards, organizational procedures, or contract terms and
conditions.
h) Each element on the work breakdown structure should be assigned a unique identifier to
distinguish one element from another.
The 100 % rule should provide that if one can associate a work breakdown structure child element with
its parent element, it should be included with the associated parent element in the work breakdown
structure. Each parent element may have zero child elements or at least two child elements.
The work breakdown structure should represent collective inputs of the project or programme team
and relevant stakeholders. The work breakdown structure should be an agreed upon decomposition
of the work to be performed by the project or programme management team. Each change made to
the work breakdown structure should also be reviewed with the project or programme management
team and the identified performing organization and performers within that organization and relevant
stakeholders.
Examples of work breakdown structures can be found in Annexes A and B.
5.2 Development
5.2.1 General
The work breakdown structure should be developed early in a project or programme. Depending upon
the project or programme, a conceptual work breakdown structure may be created during the business
case process, which may be re-evaluated or further decomposed once the project or programme is
authorized. Once developed, the work breakdown structure:
a) may provide a basis for gathering cost data across projects and programmes and may correlate
with the cost management system,
b) should serve to maintain the breakdown of the scope,
c) should allow for project and programme status to be continuously visible and in
...
NORME ISO
INTERNATIONALE 21511
Première édition
2018-05
Organigramme des tâches en
management de projet et de
programme
Work breakdown structures for project and programme management
Numéro de référence
©
ISO 2018
DOCUMENT PROTÉGÉ PAR COPYRIGHT
© ISO 2018
Tous droits réservés. Sauf prescription différente ou nécessité dans le contexte de sa mise en oeuvre, aucune partie de cette
publication ne peut être reproduite ni utilisée sous quelque forme que ce soit et par aucun procédé, électronique ou mécanique,
y compris la photocopie, ou la diffusion sur l’internet ou sur un intranet, sans autorisation écrite préalable. Une autorisation peut
être demandée à l’ISO à l’adresse ci-après ou au comité membre de l’ISO dans le pays du demandeur.
ISO copyright office
Case postale 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Tél.: +41 22 749 01 11
Fax: +41 22 749 09 47
E-mail: copyright@iso.org
Web: www.iso.org
Publié en Suisse
ii © ISO 2018 – Tous droits réservés
Sommaire Page
Avant-propos .iv
Introduction .v
1 Domaine d’application . 1
2 Références normatives . 1
3 Termes et définitions . 1
4 Concepts de l’organigramme des tâches . 3
4.1 Généralités . 3
4.2 But . 3
4.3 Contexte . 3
4.4 Décomposition hiérarchique . 4
4.5 Relations parent–enfant . 4
4.6 Élaboration progressive . 5
5 Caractéristiques d’un organigramme des tâches, son développement de et ses
relations avec d’autres structures . 5
5.1 Caractéristiques d’un organigramme des tâches . 5
5.2 Développement . 6
5.2.1 Généralités . 6
5.2.2 Création . 6
5.2.3 Description des éléments de l’organigramme des tâches d’un projet ou
d’un programme . 6
5.2.4 Composition du dictionnaire de l’organigramme des tâches . 7
5.2.5 Intégration de multiples organigrammes des tâches . 8
5.3 Relations de l’organigramme des tâches . 8
5.3.1 Généralités . 8
5.3.2 Relation avec l’organigramme fonctionnel . 8
5.3.3 Relation avec les contrats . 8
5.3.4 Relation avec des secteurs fonctionnels . 9
5.3.5 Relation avec d’autres organigrammes . 9
5.4 Contrôle de l’organigramme des tâches .10
5.5 Utilisations et avantages de l’organigramme des tâches .10
5.5.1 Utilisations de l’organigramme des tâches .10
5.5.2 Avantages de l’organigramme des tâches .11
Annexe A (informative) Organigrammes des tâches — Exemples .12
Annexe B (informative) Liens avec d’autres organigrammes — Exemples .19
Annexe C (informative) Autres organigrammes des tâches.23
Bibliographie .25
Avant-propos
L'ISO (Organisation internationale de normalisation) est une fédération mondiale d'organismes
nationaux de normalisation (comités membres de l'ISO). L'élaboration des Normes internationales est
en général confiée aux comités techniques de l'ISO. Chaque comité membre intéressé par une étude
a le droit de faire partie du comité technique créé à cet effet. Les organisations internationales,
gouvernementales et non gouvernementales, en liaison avec l'ISO participent également aux travaux.
L'ISO collabore étroitement avec la Commission électrotechnique internationale (IEC) en ce qui
concerne la normalisation électrotechnique.
Les procédures utilisées pour élaborer le présent document et celles destinées à sa mise à jour sont
décrites dans les Directives ISO/IEC, Partie 1. Il convient, en particulier de prendre note des différents
critères d'approbation requis pour les différents types de documents ISO. Le présent document a été
rédigé conformément aux règles de rédaction données dans les Directives ISO/IEC, Partie 2 (voir www
.iso .org/directives).
L'attention est attirée sur le fait que certains des éléments du présent document peuvent faire l'objet de
droits de propriété intellectuelle ou de droits analogues. L'ISO ne saurait être tenue pour responsable
de ne pas avoir identifié de tels droits de propriété et averti de leur existence. Les détails concernant
les références aux droits de propriété intellectuelle ou autres droits analogues identifiés lors de
l'élaboration du document sont indiqués dans l'Introduction et/ou dans la liste des déclarations de
brevets reçues par l'ISO (voir www .iso .org/brevets).
Les appellations commerciales éventuellement mentionnées dans le présent document sont données
pour information, par souci de commodité, à l’intention des utilisateurs et ne sauraient constituer un
engagement.
Pour une explication de la nature volontaire des normes, la signification des termes et expressions
spécifiques de l'ISO liés à l'évaluation de la conformité, ou pour toute information au sujet de l'adhésion
de l'ISO aux principes de l’Organisation mondiale du commerce (OMC) concernant les obstacles
techniques au commerce (OTC), voir le lien suivant: www .iso .org/avant -propos.
Le présent document a été élaboré par le comité technique ISO/TC 258, Management de projets,
programmes et portefeuilles.
iv © ISO 2018 – Tous droits réservés
Introduction
Le présent document a pour but de fournir des recommandations sur l’organigramme des tâches
aux personnes impliquées dans le management de projets et de programmes et intervenant dans le
développement et l’utilisation d’un organigramme des tâches. Le présent document inclut des pratiques
offrant des avantages en termes de planification et de contrôle des projets ou des programmes, et
fournit des recommandations sur les concepts de l’organigramme des tâches, sa composition et ses
relations avec d’autres structures.
Il complète l’ISO 21500 et l’ISO 21504.
Le public visé par le présent document comprend, sans toutefois s’y limiter:
a) les cadres et les personnes impliquées dans le soutien financier et politique de projets ou de
programmes;
b) les personnes gérant des projets ou des programmes et mettant en œuvre un organigramme
des tâches;
c) les personnes impliquées dans le management ou la performance des bureaux de management de
projets ou le personnel en charge du contrôle des projets ou des programmes;
d) les rédacteurs de normes nationales ou propres à un organisme.
L’application du présent document peut être adaptée pour répondre aux besoins des organismes ou
des personnes, afin de leur permettre de mieux appliquer les concepts, les exigences et les pratiques de
développement et d’utilisation d’organigrammes des tâches.
NORME INTERNATIONALE ISO 21511:2018(F)
Organigramme des tâches en management de projet et de
programme
1 Domaine d’application
Le présent document fournit des recommandations sur les organigrammes des tâches aux organismes
chargés du management de projets ou de programmes. Il s’applique à tous les types d’organismes, qu’ils
soient publics ou privés, quels que soient leur taille ou leur secteur d’activité, ainsi qu’à tout type de
projet ou de programme en fonction de leur complexité, de leur taille ou de leur durée.
Le présent document fournit une description et une définition des termes utiles, des concepts, des
caractéristiques, des avantages, des utilisations, de l’intégration et des relations, en rapport avec
les organigrammes des tâches. Il ne fournit pas de recommandations sur l’utilisation de processus,
méthodes ou outils pour les pratiques de développement et d’utilisation d’un organigramme des tâches.
Les Annexes A et B donnent des exemples d’organigrammes des tâches et de relations avec d’autres
organigrammes
2 Références normatives
Le présent document ne contient aucune référence normative.
3 Termes et définitions
Pour les besoins du présent document, les termes et définitions suivants s’appliquent.
L’ISO et l’IEC tiennent à jour des bases de données terminologiques destinées à être utilisées en
normalisation, consultables aux adresses suivantes:
— IEC Electropedia: disponible à l’adresse http: //www .electropedia .org/
— ISO Online browsing platform: disponible à l’adresse https: //www .iso .org/obp
3.1
règle des 100 %
concept concernant l’ensemble des travaux devant être accomplis pour couvrir le périmètre du projet
ou du programme est intégré dans l’organigramme des tâches (3.13)
Note 1 à l'article: La règle des 100 % s’applique aux éléments parents et enfants. Le niveau enfant de décomposition
d’un élément de l’organigramme des tâches représente 100 % du travail applicable au niveau parent.
3.2
organigramme des fonctions
décomposition des fonctions nécessaires pour réaliser les éléments de travail d’un projet ou d’un
programme
3.3
décomposition hiérarchique
processus de division du périmètre d’un projet ou d’un programme en éléments de plus en plus petits de
l’organigramme des tâches (3.15)
3.4
système d’information de management
matériel et logiciel utilisés pour prendre en charge la compilation des informations, l’analyse et la
communication des indicateurs relatifs au projet ou au programme
3.5
organigramme fonctionnel
décomposition de l’équipe de management d’un organisme, ou décomposition de l’équipe de management
qui réalise les travaux d’un projet ou d’un programme
Note 1 à l'article: L’organigramme fonctionnel peut inclure le partenariat ou la sous-traitance. Il est utilisé pour
illustrer la relation entre les activités du projet ou du programme et les unités organisationnelles qui vont gérer
ou effectuer les activités de travail.
3.6
élément parent
travail qui est décomposé en au moins deux éléments de travail de niveau inférieur
Note 1 à l'article: Les éléments de travail de niveau inférieur sont appelés éléments enfants.
3.7
organigramme d’un produit
décomposition du produit en ses composants
3.8
élaboration progressive
processus itératif visant à incorporer le niveau de détail accru identifié pendant le cycle de vie d’un
projet ou d’un programme
Note 1 à l'article: Également connue en tant que décomposition progressive.
3.9
organigramme des ressources
décomposition du personnel, des équipements, du matériel ou d’autres actifs
3.10
matrice d’attribution des responsabilités
structure documentée montrant l’attribution des responsabilités déléguées pour les travaux en vue de
la réalisation du périmètre ou des avantages
3.11
organigramme des risques
décomposition des menaces et des opportunités pour un projet ou un programme
3.12
planification par vagues
forme d’élaboration progressive (3.8) dans laquelle la planification est effectuée par phases ou périodes
3.13
organigramme des tâches
décomposition progressive du périmètre défini du projet ou du programme en niveaux inférieurs
constitués d’éléments de travail
3.14
dictionnaire de l’organigramme des tâches
document qui décrit chacun des éléments de l’organigramme des tâches (3.13)
3.15
élément de l’organigramme des tâches
travail à un niveau désigné qui est soit un élément parent soit un élément enfant
2 © ISO 2018 – Tous droits réservés
4 Concepts de l’organigramme des tâches
4.1 Généralités
Un organigramme des tâches est une décomposition de l’ensemble du périmètre des travaux qu’il
convient de réaliser pour atteindre les objectifs du projet ou du programme. L’organigramme des
tâches est utilisé tout au long du projet ou du programme afin d’établir le cadre pour le management des
travaux. Il convient que l’organigramme fournisse un cadre logique permettant de décomposer 100 %
des travaux définis par le périmètre du projet ou du programme.
NOTE Actuellement, la plupart des organigrammes des tâches sont hiérarchiques, et le présent document
sera axé sur ce type d’organigramme. De nouveaux modèles de logiciel offrent des options pour la structure de
décomposition hiérarchique. Voir l’Annexe C.
Il convient que chaque niveau descendant de l’organigramme des tâches fournisse une définition plus
détaillée du travail. Le travail peut être orienté produit, orienté livrables ou orienté résultat et, de
plus, peut être axé sur des phases du projet ou du programme, des disciplines ou des lieux. Il convient
que l’ensemble du périmètre du projet ou du programme englobe les travaux devant être réalisés par
l’équipe de management du projet ou du programme ou les membres de l’équipe, les sous-traitants et
d’autres parties prenantes.
4.2 But
Il convient que l’utilisation d’un organigramme des tâches ait pour but d’améliorer et de soutenir le
management d’un projet ou d’un programme en permettant notamment, sans toutefois s’y limiter:
a) la planification du projet ou du programme;
b) la décomposition du périmètre du projet ou du programme en éléments de travail plus petits afin
de pouvoir gérer et maîtriser le périmètre, les ressources et la durée du projet ou du programme;
c) l’amélioration de la communication relative au projet ou au programme en fournissant un cadre
commun que les parties prenantes utilisent pour décrire et analyser le périmètre et la réalisation
du projet ou du programme;
d) la communication sur les avantages fournis par divers éléments du projet ou du programme;
e) la synthèse des données de performance du projet à des fins de compte rendu au niveau stratégique;
f) l’analyse des performances, dans différents projets ou programmes, d’éléments particuliers de
l’organigramme des tâches ayant des caractéristiques communes identifiables, telles que des codes,
afin d’identifier des domaines préoccupants et des opportunités d’amélioration; et
g) l’alignement des tâches et des activités de l’échéancier sur les éléments de l’organigramme des tâches.
NOTE Un organigramme des tâches peut, dans certains cas, se référer à l’organigramme de produit et avoir
des limites d’utilisation supplémentaires. Un organigramme de produit décrit généralement le résultat d’un
projet, mais peut également se rapporter à un produit existant et à sa décomposition hiérarchique d’éléments.
L’utilisation de ce terme peut varier d’un organisme à l’autre.
4.3 Contexte
L’organigramme des tâches est un concept flexible, et il convient d’adapter sa conception et sa
structure d’ensemble aux exigences du projet ou du programme. Il convient que l’organigramme des
tâches dépende du secteur industriel, du type de projet ou de programme, et d’autres facteurs tels
que les phases du projet, les principaux livrables, le périmètre, l’organisme réalisant les travaux et
l’emplacement des ressources. Il convient que l’organigramme des tâches soit suffisamment flexible
pour s’adapter à d’autres façons d’organiser et de représenter les travaux.
4.4 Décomposition hiérarchique
Il convient que l’organigramme des tâches fournisse une décomposition hiérarchique des éléments
jusqu’au niveau nécessaire pour planifier et gérer les travaux en vue d’atteindre les objectifs du projet
ou du programme.
Il convient que la décomposition hiérarchique englobe 100 % des travaux contenus dans le périmètre
du projet ou du programme. Lorsqu’un élément est décomposé en éléments enfants, il convient que
l’ensemble des travaux définis par les éléments de niveau inférieur représente 100 % des travaux
contenus dans l’élément parent. La convention parent–enfant décrit une relation avec une hiérarchie
dans laquelle un élément individuel peut simultanément être le parent d’un certain nombre d’éléments
enfants et l’enfant d’un élément de niveau supérieur.
Dans le cadre d’un programme, il convient que les projets, les autres programmes et les autres travaux
connexes soient décomposés d’une manière similaire. Le programme devient le niveau le plus élevé
de l’organigramme des tâches. Il convient d’appliquer la convention parent–enfant aux relations
logiques dans la hiérarchie. Chaque projet, programme ou autres travaux connexes dans le cadre d’un
programme peut développer un organigramme des tâches indépendant qui peut être représenté comme
un organigramme des tâches séparé ou comme une partie de l’organigramme des tâches combiné du
programme.
Certains projets ou programmes peuvent ne pas avoir de périmètre fixe; par conséquent, tout périmètre
inconnu ou non défini ne sera pas inclus dans l’organigramme des tâches. Ces projets peuvent utiliser
une élaboration progressive et agile, ou des techniques de planification par vagues, dans lesquelles
le périmètre est défini au fur et à mesure de l’avancement du projet. Dans ce cas, l’organigramme
des tâches représente 100 % du périmètre des travaux connus au moment du développement de cet
organigramme. Lorsque des modifications du périmètre sont identifiées durant la vie du projet ou du
programme, il convient de prendre en compte le périmètre identifié dans l’organigramme des tâches,
tout en conservant le flux logique des niveaux de l’organigramme des tâches et la relation parent–enfant.
4.5 Relations parent–enfant
Selon le type de projet ou de programme et l’organigramme des tâches développé, il existe diverses
options pour créer des relations parent–enfant. Il existe différentes manières de représenter le
périmètre, c’est-à-dire diverses options pour développer la structure de l’organigramme des tâches.
Une liste non exclusive de relations parent–enfant est donnée ci-après:
a) les éléments enfants appartiennent à l’élément parent. La relation reflète le segment final de
l’élément de sortie, du produit ou du résultat du projet ou du programme, qui peut être physique ou
conceptuel;
b) les éléments enfants appartiennent à une catégorie définie par le parent. Les catégories peuvent
être basées sur le temps, la phase, la relation, le lieu, la priorité ou la discipline;
c) les éléments enfants font partie du même état décrit par le parent. Les états peuvent être des
versions provisoires du produit, tels que des projets, des versions préliminaires, des prototypes,
des maquettes ou des versions finales;
d) les éléments enfants sont des produits ou services nécessaires à la réalisation du parent. Ces
produits ou services peuvent inclure des outils, des produits ou services préalablement requis, ou
une documentation sur l’approvisionnement, les contrats, l’ingénierie, la construction, la mise en
service et le management de projet ou de programme;
e) les éléments enfants sont des objectifs nécessaires à la réalisation du parent. Ces éléments enfants
peuvent se rapporter aux objectifs du projet ou du programme, à un changement des comportements
ou à l’impact d’un changement organisationnel.
Ces relations parent–enfant peuvent être combinées pour obtenir une décomposition complète du
périmètre du projet ou du programme en un organigramme des tâches.
4 © ISO 2018 – Tous droits réservés
4.6 Élaboration progressive
L’élaboration progressive est particulièrement utile lorsque le périmètre détaillé est inconnu, non
défini ou sujet à modification. Il convient qu’une telle augmentation progressive du niveau de détail de
l’organigramme des tâches aboutisse à un organigramme des tâches plus précis et améliore l’utilisation
de l’organigramme pour gérer le projet ou le programme. Une élaboration progressive peut entraîner
une modification ou des modifications simultanées ou successives de l’organigramme des tâches. La
planification par vagues est une forme d’élaboration progressive fondée sur le temps.
5 Caractéristiques d’un organigramme des tâches, son développement de et ses
relations avec d’autres structures
5.1 Caractéristiques d’un organigramme des tâches
Il convient que les caractéristiques d’un organigramme des tâches soient liées au périmètre du projet
ou du programme pour lequel il est composé. Les caractéristiques types d’un organigramme des tâches
sont les suivantes:
a) un organigramme des tâches peut être présenté selon divers formats. Les formats les plus courants
pour un organigramme des tâches sont graphiques, descriptifs et tabulaires;
b) les éléments d’un organigramme des tâches ne doivent pas tous être décomposés jusqu’au
même niveau, mais il convient qu’ils soient décomposés jusqu’au niveau nécessaire pour gérer le
composant du projet ou du programme;
c) chaque élément de l’organigramme des tâches peut être assigné à une personne, une entité ou une
fonction responsable;
d) il convient qu’un organigramme des tâches reflète la complexité technique, la taille et d’autres
informations jugées nécessaires pour le périmètre;
e) un organigramme des tâches définit la structure des travaux et non les processus impliqués dans la
réalisation des travaux;
f) il convient qu’un organigramme des tâches fournisse une décomposition hiérarchique des éléments,
en appliquant la règle des 100 %, jusqu’au niveau nécessaire pour planifier et gérer les travaux en
vue d’atteindre les objectifs du projet ou du programme;
g) le contenu des éléments composant le périmètre peut être lié, sans toutefois s’y limiter, à des
considérations telles que des normes industrielles, des procédures de l’organisme ou des conditions
contractuelles;
h) il convient d’attribuer à chaque élément de l’organigramme des tâches un identifiant unique
permettant de distinguer les éléments les uns des autres.
Il convient que la règle des 100 % prévoit que, s’il est possible d’associer un élément enfant de
l’organigramme des tâches à son élément parent, il convient qu’il soit inclus avec l’élément parent
associé dans l’organigramme des tâches. Chaque élément parent peut n’avoir aucun élément enfant ou
au moins deux éléments enfants.
Il convient que l’organigramme des tâches représente les données d’entrée collectives de l’équipe de
projet ou de programme et des parties prenantes pertinentes. Il convient que l’organigramme des
tâches soit une décomposition convenue des travaux devant être réalisés par l’équipe de management
de projet ou de programme. Il convient également que chaque modification apportée à l’organigramme
des tâches soit revue par l’équipe de management de projet ou de programme, par l’organisme identifié
en charge des travaux et les exécutants au sein de cet organisme, ainsi que par les parties prenantes
pertinentes.
Des exemples d’organigrammes des tâches sont donnés dans les Annexes A et B.
5.2 Développement
5.2.1 Généralités
Il convient que l’organigramme des tâches soit développé dès le début d’un projet ou d’un programme.
Selon le projet ou le programme, un organigramme des tâches conceptuel peut être élaboré pendant le
processus d’étude économique, puis réévalué ou décomposé une fois que le projet ou le programme est
autorisé. Une fois développé, l’organigramme des tâches:
a) peut servir de base pour la collecte des données de coût de projets et de programmes et peut être
mis en corrélation avec le système de gestion des coûts;
b) sert à tenir à jour la décomposition du périmètre;
c) permet de visualiser et d’intégrer en continu l’état du projet ou du programme;
d) facilite la communication entre les membres de l’équipe de projet ou de programme, ainsi qu’avec
les parties prenantes internes et externes;
e) peut être utilisé pour affecter des ressources adéquates aux éléments identifiés de l’organigramme
des tâches; et
f) est maintenu et mis à jour, si nécessaire, jusqu’à ce que les livrables finaux soient
...
NORME ISO
INTERNATIONALE 21511
Première édition
2018-05
Organigramme des tâches en
management de projet et de
programme
Work breakdown structures for project and programme management
Numéro de référence
©
ISO 2018
DOCUMENT PROTÉGÉ PAR COPYRIGHT
© ISO 2018
Tous droits réservés. Sauf prescription différente ou nécessité dans le contexte de sa mise en oeuvre, aucune partie de cette
publication ne peut être reproduite ni utilisée sous quelque forme que ce soit et par aucun procédé, électronique ou mécanique,
y compris la photocopie, ou la diffusion sur l’internet ou sur un intranet, sans autorisation écrite préalable. Une autorisation peut
être demandée à l’ISO à l’adresse ci-après ou au comité membre de l’ISO dans le pays du demandeur.
ISO copyright office
Case postale 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Tél.: +41 22 749 01 11
Fax: +41 22 749 09 47
E-mail: copyright@iso.org
Web: www.iso.org
Publié en Suisse
ii © ISO 2018 – Tous droits réservés
Sommaire Page
Avant-propos .iv
Introduction .v
1 Domaine d’application . 1
2 Références normatives . 1
3 Termes et définitions . 1
4 Concepts de l’organigramme des tâches . 3
4.1 Généralités . 3
4.2 But . 3
4.3 Contexte . 3
4.4 Décomposition hiérarchique . 4
4.5 Relations parent–enfant . 4
4.6 Élaboration progressive . 5
5 Caractéristiques d’un organigramme des tâches, son développement de et ses
relations avec d’autres structures . 5
5.1 Caractéristiques d’un organigramme des tâches . 5
5.2 Développement . 6
5.2.1 Généralités . 6
5.2.2 Création . 6
5.2.3 Description des éléments de l’organigramme des tâches d’un projet ou
d’un programme . 6
5.2.4 Composition du dictionnaire de l’organigramme des tâches . 7
5.2.5 Intégration de multiples organigrammes des tâches . 8
5.3 Relations de l’organigramme des tâches . 8
5.3.1 Généralités . 8
5.3.2 Relation avec l’organigramme fonctionnel . 8
5.3.3 Relation avec les contrats . 8
5.3.4 Relation avec des secteurs fonctionnels . 9
5.3.5 Relation avec d’autres organigrammes . 9
5.4 Contrôle de l’organigramme des tâches .10
5.5 Utilisations et avantages de l’organigramme des tâches .10
5.5.1 Utilisations de l’organigramme des tâches .10
5.5.2 Avantages de l’organigramme des tâches .11
Annexe A (informative) Organigrammes des tâches — Exemples .12
Annexe B (informative) Liens avec d’autres organigrammes — Exemples .19
Annexe C (informative) Autres organigrammes des tâches.23
Bibliographie .25
Avant-propos
L'ISO (Organisation internationale de normalisation) est une fédération mondiale d'organismes
nationaux de normalisation (comités membres de l'ISO). L'élaboration des Normes internationales est
en général confiée aux comités techniques de l'ISO. Chaque comité membre intéressé par une étude
a le droit de faire partie du comité technique créé à cet effet. Les organisations internationales,
gouvernementales et non gouvernementales, en liaison avec l'ISO participent également aux travaux.
L'ISO collabore étroitement avec la Commission électrotechnique internationale (IEC) en ce qui
concerne la normalisation électrotechnique.
Les procédures utilisées pour élaborer le présent document et celles destinées à sa mise à jour sont
décrites dans les Directives ISO/IEC, Partie 1. Il convient, en particulier de prendre note des différents
critères d'approbation requis pour les différents types de documents ISO. Le présent document a été
rédigé conformément aux règles de rédaction données dans les Directives ISO/IEC, Partie 2 (voir www
.iso .org/directives).
L'attention est attirée sur le fait que certains des éléments du présent document peuvent faire l'objet de
droits de propriété intellectuelle ou de droits analogues. L'ISO ne saurait être tenue pour responsable
de ne pas avoir identifié de tels droits de propriété et averti de leur existence. Les détails concernant
les références aux droits de propriété intellectuelle ou autres droits analogues identifiés lors de
l'élaboration du document sont indiqués dans l'Introduction et/ou dans la liste des déclarations de
brevets reçues par l'ISO (voir www .iso .org/brevets).
Les appellations commerciales éventuellement mentionnées dans le présent document sont données
pour information, par souci de commodité, à l’intention des utilisateurs et ne sauraient constituer un
engagement.
Pour une explication de la nature volontaire des normes, la signification des termes et expressions
spécifiques de l'ISO liés à l'évaluation de la conformité, ou pour toute information au sujet de l'adhésion
de l'ISO aux principes de l’Organisation mondiale du commerce (OMC) concernant les obstacles
techniques au commerce (OTC), voir le lien suivant: www .iso .org/avant -propos.
Le présent document a été élaboré par le comité technique ISO/TC 258, Management de projets,
programmes et portefeuilles.
iv © ISO 2018 – Tous droits réservés
Introduction
Le présent document a pour but de fournir des recommandations sur l’organigramme des tâches
aux personnes impliquées dans le management de projets et de programmes et intervenant dans le
développement et l’utilisation d’un organigramme des tâches. Le présent document inclut des pratiques
offrant des avantages en termes de planification et de contrôle des projets ou des programmes, et
fournit des recommandations sur les concepts de l’organigramme des tâches, sa composition et ses
relations avec d’autres structures.
Il complète l’ISO 21500 et l’ISO 21504.
Le public visé par le présent document comprend, sans toutefois s’y limiter:
a) les cadres et les personnes impliquées dans le soutien financier et politique de projets ou de
programmes;
b) les personnes gérant des projets ou des programmes et mettant en œuvre un organigramme
des tâches;
c) les personnes impliquées dans le management ou la performance des bureaux de management de
projets ou le personnel en charge du contrôle des projets ou des programmes;
d) les rédacteurs de normes nationales ou propres à un organisme.
L’application du présent document peut être adaptée pour répondre aux besoins des organismes ou
des personnes, afin de leur permettre de mieux appliquer les concepts, les exigences et les pratiques de
développement et d’utilisation d’organigrammes des tâches.
NORME INTERNATIONALE ISO 21511:2018(F)
Organigramme des tâches en management de projet et de
programme
1 Domaine d’application
Le présent document fournit des recommandations sur les organigrammes des tâches aux organismes
chargés du management de projets ou de programmes. Il s’applique à tous les types d’organismes, qu’ils
soient publics ou privés, quels que soient leur taille ou leur secteur d’activité, ainsi qu’à tout type de
projet ou de programme en fonction de leur complexité, de leur taille ou de leur durée.
Le présent document fournit une description et une définition des termes utiles, des concepts, des
caractéristiques, des avantages, des utilisations, de l’intégration et des relations, en rapport avec
les organigrammes des tâches. Il ne fournit pas de recommandations sur l’utilisation de processus,
méthodes ou outils pour les pratiques de développement et d’utilisation d’un organigramme des tâches.
Les Annexes A et B donnent des exemples d’organigrammes des tâches et de relations avec d’autres
organigrammes
2 Références normatives
Le présent document ne contient aucune référence normative.
3 Termes et définitions
Pour les besoins du présent document, les termes et définitions suivants s’appliquent.
L’ISO et l’IEC tiennent à jour des bases de données terminologiques destinées à être utilisées en
normalisation, consultables aux adresses suivantes:
— IEC Electropedia: disponible à l’adresse http: //www .electropedia .org/
— ISO Online browsing platform: disponible à l’adresse https: //www .iso .org/obp
3.1
règle des 100 %
concept concernant l’ensemble des travaux devant être accomplis pour couvrir le périmètre du projet
ou du programme est intégré dans l’organigramme des tâches (3.13)
Note 1 à l'article: La règle des 100 % s’applique aux éléments parents et enfants. Le niveau enfant de décomposition
d’un élément de l’organigramme des tâches représente 100 % du travail applicable au niveau parent.
3.2
organigramme des fonctions
décomposition des fonctions nécessaires pour réaliser les éléments de travail d’un projet ou d’un
programme
3.3
décomposition hiérarchique
processus de division du périmètre d’un projet ou d’un programme en éléments de plus en plus petits de
l’organigramme des tâches (3.15)
3.4
système d’information de management
matériel et logiciel utilisés pour prendre en charge la compilation des informations, l’analyse et la
communication des indicateurs relatifs au projet ou au programme
3.5
organigramme fonctionnel
décomposition de l’équipe de management d’un organisme, ou décomposition de l’équipe de management
qui réalise les travaux d’un projet ou d’un programme
Note 1 à l'article: L’organigramme fonctionnel peut inclure le partenariat ou la sous-traitance. Il est utilisé pour
illustrer la relation entre les activités du projet ou du programme et les unités organisationnelles qui vont gérer
ou effectuer les activités de travail.
3.6
élément parent
travail qui est décomposé en au moins deux éléments de travail de niveau inférieur
Note 1 à l'article: Les éléments de travail de niveau inférieur sont appelés éléments enfants.
3.7
organigramme d’un produit
décomposition du produit en ses composants
3.8
élaboration progressive
processus itératif visant à incorporer le niveau de détail accru identifié pendant le cycle de vie d’un
projet ou d’un programme
Note 1 à l'article: Également connue en tant que décomposition progressive.
3.9
organigramme des ressources
décomposition du personnel, des équipements, du matériel ou d’autres actifs
3.10
matrice d’attribution des responsabilités
structure documentée montrant l’attribution des responsabilités déléguées pour les travaux en vue de
la réalisation du périmètre ou des avantages
3.11
organigramme des risques
décomposition des menaces et des opportunités pour un projet ou un programme
3.12
planification par vagues
forme d’élaboration progressive (3.8) dans laquelle la planification est effectuée par phases ou périodes
3.13
organigramme des tâches
décomposition progressive du périmètre défini du projet ou du programme en niveaux inférieurs
constitués d’éléments de travail
3.14
dictionnaire de l’organigramme des tâches
document qui décrit chacun des éléments de l’organigramme des tâches (3.13)
3.15
élément de l’organigramme des tâches
travail à un niveau désigné qui est soit un élément parent soit un élément enfant
2 © ISO 2018 – Tous droits réservés
4 Concepts de l’organigramme des tâches
4.1 Généralités
Un organigramme des tâches est une décomposition de l’ensemble du périmètre des travaux qu’il
convient de réaliser pour atteindre les objectifs du projet ou du programme. L’organigramme des
tâches est utilisé tout au long du projet ou du programme afin d’établir le cadre pour le management des
travaux. Il convient que l’organigramme fournisse un cadre logique permettant de décomposer 100 %
des travaux définis par le périmètre du projet ou du programme.
NOTE Actuellement, la plupart des organigrammes des tâches sont hiérarchiques, et le présent document
sera axé sur ce type d’organigramme. De nouveaux modèles de logiciel offrent des options pour la structure de
décomposition hiérarchique. Voir l’Annexe C.
Il convient que chaque niveau descendant de l’organigramme des tâches fournisse une définition plus
détaillée du travail. Le travail peut être orienté produit, orienté livrables ou orienté résultat et, de
plus, peut être axé sur des phases du projet ou du programme, des disciplines ou des lieux. Il convient
que l’ensemble du périmètre du projet ou du programme englobe les travaux devant être réalisés par
l’équipe de management du projet ou du programme ou les membres de l’équipe, les sous-traitants et
d’autres parties prenantes.
4.2 But
Il convient que l’utilisation d’un organigramme des tâches ait pour but d’améliorer et de soutenir le
management d’un projet ou d’un programme en permettant notamment, sans toutefois s’y limiter:
a) la planification du projet ou du programme;
b) la décomposition du périmètre du projet ou du programme en éléments de travail plus petits afin
de pouvoir gérer et maîtriser le périmètre, les ressources et la durée du projet ou du programme;
c) l’amélioration de la communication relative au projet ou au programme en fournissant un cadre
commun que les parties prenantes utilisent pour décrire et analyser le périmètre et la réalisation
du projet ou du programme;
d) la communication sur les avantages fournis par divers éléments du projet ou du programme;
e) la synthèse des données de performance du projet à des fins de compte rendu au niveau stratégique;
f) l’analyse des performances, dans différents projets ou programmes, d’éléments particuliers de
l’organigramme des tâches ayant des caractéristiques communes identifiables, telles que des codes,
afin d’identifier des domaines préoccupants et des opportunités d’amélioration; et
g) l’alignement des tâches et des activités de l’échéancier sur les éléments de l’organigramme des tâches.
NOTE Un organigramme des tâches peut, dans certains cas, se référer à l’organigramme de produit et avoir
des limites d’utilisation supplémentaires. Un organigramme de produit décrit généralement le résultat d’un
projet, mais peut également se rapporter à un produit existant et à sa décomposition hiérarchique d’éléments.
L’utilisation de ce terme peut varier d’un organisme à l’autre.
4.3 Contexte
L’organigramme des tâches est un concept flexible, et il convient d’adapter sa conception et sa
structure d’ensemble aux exigences du projet ou du programme. Il convient que l’organigramme des
tâches dépende du secteur industriel, du type de projet ou de programme, et d’autres facteurs tels
que les phases du projet, les principaux livrables, le périmètre, l’organisme réalisant les travaux et
l’emplacement des ressources. Il convient que l’organigramme des tâches soit suffisamment flexible
pour s’adapter à d’autres façons d’organiser et de représenter les travaux.
4.4 Décomposition hiérarchique
Il convient que l’organigramme des tâches fournisse une décomposition hiérarchique des éléments
jusqu’au niveau nécessaire pour planifier et gérer les travaux en vue d’atteindre les objectifs du projet
ou du programme.
Il convient que la décomposition hiérarchique englobe 100 % des travaux contenus dans le périmètre
du projet ou du programme. Lorsqu’un élément est décomposé en éléments enfants, il convient que
l’ensemble des travaux définis par les éléments de niveau inférieur représente 100 % des travaux
contenus dans l’élément parent. La convention parent–enfant décrit une relation avec une hiérarchie
dans laquelle un élément individuel peut simultanément être le parent d’un certain nombre d’éléments
enfants et l’enfant d’un élément de niveau supérieur.
Dans le cadre d’un programme, il convient que les projets, les autres programmes et les autres travaux
connexes soient décomposés d’une manière similaire. Le programme devient le niveau le plus élevé
de l’organigramme des tâches. Il convient d’appliquer la convention parent–enfant aux relations
logiques dans la hiérarchie. Chaque projet, programme ou autres travaux connexes dans le cadre d’un
programme peut développer un organigramme des tâches indépendant qui peut être représenté comme
un organigramme des tâches séparé ou comme une partie de l’organigramme des tâches combiné du
programme.
Certains projets ou programmes peuvent ne pas avoir de périmètre fixe; par conséquent, tout périmètre
inconnu ou non défini ne sera pas inclus dans l’organigramme des tâches. Ces projets peuvent utiliser
une élaboration progressive et agile, ou des techniques de planification par vagues, dans lesquelles
le périmètre est défini au fur et à mesure de l’avancement du projet. Dans ce cas, l’organigramme
des tâches représente 100 % du périmètre des travaux connus au moment du développement de cet
organigramme. Lorsque des modifications du périmètre sont identifiées durant la vie du projet ou du
programme, il convient de prendre en compte le périmètre identifié dans l’organigramme des tâches,
tout en conservant le flux logique des niveaux de l’organigramme des tâches et la relation parent–enfant.
4.5 Relations parent–enfant
Selon le type de projet ou de programme et l’organigramme des tâches développé, il existe diverses
options pour créer des relations parent–enfant. Il existe différentes manières de représenter le
périmètre, c’est-à-dire diverses options pour développer la structure de l’organigramme des tâches.
Une liste non exclusive de relations parent–enfant est donnée ci-après:
a) les éléments enfants appartiennent à l’élément parent. La relation reflète le segment final de
l’élément de sortie, du produit ou du résultat du projet ou du programme, qui peut être physique ou
conceptuel;
b) les éléments enfants appartiennent à une catégorie définie par le parent. Les catégories peuvent
être basées sur le temps, la phase, la relation, le lieu, la priorité ou la discipline;
c) les éléments enfants font partie du même état décrit par le parent. Les états peuvent être des
versions provisoires du produit, tels que des projets, des versions préliminaires, des prototypes,
des maquettes ou des versions finales;
d) les éléments enfants sont des produits ou services nécessaires à la réalisation du parent. Ces
produits ou services peuvent inclure des outils, des produits ou services préalablement requis, ou
une documentation sur l’approvisionnement, les contrats, l’ingénierie, la construction, la mise en
service et le management de projet ou de programme;
e) les éléments enfants sont des objectifs nécessaires à la réalisation du parent. Ces éléments enfants
peuvent se rapporter aux objectifs du projet ou du programme, à un changement des comportements
ou à l’impact d’un changement organisationnel.
Ces relations parent–enfant peuvent être combinées pour obtenir une décomposition complète du
périmètre du projet ou du programme en un organigramme des tâches.
4 © ISO 2018 – Tous droits réservés
4.6 Élaboration progressive
L’élaboration progressive est particulièrement utile lorsque le périmètre détaillé est inconnu, non
défini ou sujet à modification. Il convient qu’une telle augmentation progressive du niveau de détail de
l’organigramme des tâches aboutisse à un organigramme des tâches plus précis et améliore l’utilisation
de l’organigramme pour gérer le projet ou le programme. Une élaboration progressive peut entraîner
une modification ou des modifications simultanées ou successives de l’organigramme des tâches. La
planification par vagues est une forme d’élaboration progressive fondée sur le temps.
5 Caractéristiques d’un organigramme des tâches, son développement de et ses
relations avec d’autres structures
5.1 Caractéristiques d’un organigramme des tâches
Il convient que les caractéristiques d’un organigramme des tâches soient liées au périmètre du projet
ou du programme pour lequel il est composé. Les caractéristiques types d’un organigramme des tâches
sont les suivantes:
a) un organigramme des tâches peut être présenté selon divers formats. Les formats les plus courants
pour un organigramme des tâches sont graphiques, descriptifs et tabulaires;
b) les éléments d’un organigramme des tâches ne doivent pas tous être décomposés jusqu’au
même niveau, mais il convient qu’ils soient décomposés jusqu’au niveau nécessaire pour gérer le
composant du projet ou du programme;
c) chaque élément de l’organigramme des tâches peut être assigné à une personne, une entité ou une
fonction responsable;
d) il convient qu’un organigramme des tâches reflète la complexité technique, la taille et d’autres
informations jugées nécessaires pour le périmètre;
e) un organigramme des tâches définit la structure des travaux et non les processus impliqués dans la
réalisation des travaux;
f) il convient qu’un organigramme des tâches fournisse une décomposition hiérarchique des éléments,
en appliquant la règle des 100 %, jusqu’au niveau nécessaire pour planifier et gérer les travaux en
vue d’atteindre les objectifs du projet ou du programme;
g) le contenu des éléments composant le périmètre peut être lié, sans toutefois s’y limiter, à des
considérations telles que des normes industrielles, des procédures de l’organisme ou des conditions
contractuelles;
h) il convient d’attribuer à chaque élément de l’organigramme des tâches un identifiant unique
permettant de distinguer les éléments les uns des autres.
Il convient que la règle des 100 % prévoit que, s’il est possible d’associer un élément enfant de
l’organigramme des tâches à son élément parent, il convient qu’il soit inclus avec l’élément parent
associé dans l’organigramme des tâches. Chaque élément parent peut n’avoir aucun élément enfant ou
au moins deux éléments enfants.
Il convient que l’organigramme des tâches représente les données d’entrée collectives de l’équipe de
projet ou de programme et des parties prenantes pertinentes. Il convient que l’organigramme des
tâches soit une décomposition convenue des travaux devant être réalisés par l’équipe de management
de projet ou de programme. Il convient également que chaque modification apportée à l’organigramme
des tâches soit revue par l’équipe de management de projet ou de programme, par l’organisme identifié
en charge des travaux et les exécutants au sein de cet organisme, ainsi que par les parties prenantes
pertinentes.
Des exemples d’organigrammes des tâches sont donnés dans les Annexes A et B.
5.2 Développement
5.2.1 Généralités
Il convient que l’organigramme des tâches soit développé dès le début d’un projet ou d’un programme.
Selon le projet ou le programme, un organigramme des tâches conceptuel peut être élaboré pendant le
processus d’étude économique, puis réévalué ou décomposé une fois que le projet ou le programme est
autorisé. Une fois développé, l’organigramme des tâches:
a) peut servir de base pour la collecte des données de coût de projets et de programmes et peut être
mis en corrélation avec le système de gestion des coûts;
b) sert à tenir à jour la décomposition du périmètre;
c) permet de visualiser et d’intégrer en continu l’état du projet ou du programme;
d) facilite la communication entre les membres de l’équipe de projet ou de programme, ainsi qu’avec
les parties prenantes internes et externes;
e) peut être utilisé pour affecter des ressources adéquates aux éléments identifiés de l’organigramme
des tâches; et
f) est maintenu et mis à jour, si nécessaire, jusqu’à ce que les livrables finaux soient
...