ETSI TS 104 200 V1.1.1 (2025-11)
Data Solutions (DATA); Proof of Concept Framework
Data Solutions (DATA); Proof of Concept Framework
DTS/DATA-00104200
General Information
Standards Content (Sample)
TECHNICAL SPECIFICATION
Data Solutions (DATA);
Proof of Concept Framework
2 ETSI TS 104 200 V1.1.1 (2025-11)
Reference
DTS/DATA-00104200
Keywords
interoperability, proof of concept, testing
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE
Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16
Siret N° 348 623 562 00017 - APE 7112B
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° w061004871
Important notice
The present document can be downloaded from the
ETSI Search & Browse Standards application.
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format on ETSI deliver repository.
Users should be aware that the present document may be revised or have its status changed,
this information is available in the Milestones listing.
If you find errors in the present document, please send your comments to
the relevant service listed under Committee Support Staff.
If you find a security vulnerability in the present document, please report it through our
Coordinated Vulnerability Disclosure (CVD) program.
Notice of disclaimer & limitation of liability
The information provided in the present deliverable is directed solely to professionals who have the appropriate degree of
experience to understand and interpret its content in accordance with generally accepted engineering or
other professional standard and applicable regulations.
No recommendation as to products and services or vendors is made or should be implied.
No representation or warranty is made that this deliverable is technically accurate or sufficient or conforms to any law
and/or governmental rule and/or regulation and further, no representation or warranty is made of merchantability or fitness
for any particular purpose or against infringement of intellectual property rights.
In no event shall ETSI be held liable for loss of profits or any other incidental or consequential damages.
Any software contained in this deliverable is provided "AS IS" with no warranties, express or implied, including but not
limited to, the warranties of merchantability, fitness for a particular purpose and non-infringement of intellectual property
rights and ETSI shall not be held liable in any event for any damages whatsoever (including, without limitation, damages
for loss of profits, business interruption, loss of information, or any other pecuniary loss) arising out of or related to the use
of or inability to use the software.
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and
microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.
© ETSI 2025.
All rights reserved.
ETSI
3 ETSI TS 104 200 V1.1.1 (2025-11)
Contents
Intellectual Property Rights . 5
Foreword . 5
Modal verbs terminology . 5
Executive summary . 5
Introduction . 5
1 Scope . 6
2 References . 6
2.1 Normative references . 6
2.2 Informative references . 6
3 Definition of terms, symbols and abbreviations . 6
3.1 Terms . 6
3.2 Symbols . 7
3.3 Abbreviations . 7
4 TC DATA PoC Framework . 7
4.1 Rationale. 7
4.2 Call for PoCs . 7
4.3 TC DATA PoC Proposal Submission . 8
4.4 TC DATA PoC Proposal Review . 8
4.4.1 General . 8
4.4.2 Accepted TC DATA PoC Proposals . 8
4.4.3 Rejected TC DATA PoC Proposals . 8
4.5 TC DATA PoC Proposal Acceptance Criteria . 9
4.6 TC DATA PoC Report . 10
5 Overall Roles and Activities within PoCs . 11
5.1 General . 11
5.2 ETSI CTI Role . 11
5.3 Other roles and responsibilities . 11
5.4 PoC activity process . 12
Annex A (normative): TC DATA - PoC Proposal Template . 13
A.1 PoC Project Details . 13
A.1.1 PoC Project . 13
A.1.2 PoC Team Members . 13
A.1.3 PoC Project Scope . 13
A.1.3.1 PoC Goals . 13
A.1.3.2 PoC Topics. 13
A.1.3.3 Other topics in scope. 14
A.1.4 PoC Project Stages/Milestones . 14
A.1.5 Additional Details. 14
A.2 PoC Technical Details . 14
A.2.1 PoC Overview . 14
A.2.2 PoC Architecture . 14
A.2.3 PoC Success Criteria . 15
A.2.4 Additional information . 15
Annex B (normative): TC DATA PoC Report Template . 16
B.1 General . 16
B.2 TC DATA PoC Report . 16
B.2.1 PoC Project Completion Status . 16
B.2.2 TC DATA PoC Project Participants . 16
ETSI
4 ETSI TS 104 200 V1.1.1 (2025-11)
B.2.3 Confirmation of PoC Event Occurrence . 16
B.2.4 PoC Goals Status Report . 17
B.2.5 PoC Feedback Received from Third Parties (Optional) . 17
B.3 TC DATA PoC Technical Report (Optional) . 17
B.3.1 General . 17
B.3.2 PoC Contribution to TC DATA . 17
B.3.3 Gaps identified in the TC DATA standardization . 17
B.3.4 PoC Suggested Action Items . 18
B.3.5 Additional messages to TC DATA . 18
B.3.6 Additional messages to Network Operators and Service Providers . 18
History . 19
ETSI
5 ETSI TS 104 200 V1.1.1 (2025-11)
Intellectual Property Rights
Essential patents
IPRs essential or potentially essential to normative deliverables may have been declared to ETSI. The declarations
pertaining to these essential IPRs, if any, are publicly available for ETSI members and non-members, and can be
found in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to
ETSI in respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the
ETSI IPR online database.
Pursuant to the ETSI Directives including the ETSI IPR Policy, no investigation regarding the essentiality of IPRs,
including IPR searches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not
referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become,
essential to the present document.
Trademarks
The present document may include trademarks and/or tradenames which are asserted and/or registered by their owners.
ETSI claims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no
right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does
not constitute an endorsement by ETSI of products, services or organizations associated with those trademarks.
DECT™, PLUGTESTS™, UMTS™ and the ETSI logo are trademarks of ETSI registered for the benefit of its
Members. 3GPP™, LTE™ and 5G™ logo are trademarks of ETSI registered for the benefit of its Members and of the
3GPP Organizational Partners. oneM2M™ logo is a trademark of ETSI registered for the benefit of its Members and of ®
the oneM2M Partners. GSM and the GSM logo are trademarks registered and owned by the GSM Association.
Foreword
This Technical Specification (TS) has been produced by ETSI Technical Committee Data Solutions (DATA).
Modal verbs terminology
In the present document "shall", "shall not", "should", "should not", "may", "need not", "will", "will not", "can" and
"cannot" are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of
provisions).
"must" and "must not" are NOT allowed in ETSI deliverables except when used in direct citation.
Executive summary
The present document says how to progress a Proof of Concept project. The IPR of Proof of Concept project team is
within the team and not required by ETSI or ETSI members.
Introduction
The present document specifies how to propose, report progress and finalize a Proof of Concept project. The Clauses
detail the process and when to send emails to whom. Clause 4 is the TC DATA PoC Framework. Clause 5 specifies the
roles and responsibilities. The Annexes provide templates of the proposal and the final report that are to be used be used
when reporting the start and completion.
ETSI
6 ETSI TS 104 200 V1.1.1 (2025-11)
1 Scope
The present document specifies a framework for use within ETSI TC DATA to coordinate and promote public
demonstrations of Proof of Concept (PoC) validating key technical components developed in TC DATA.
The objective for the PoCs is to build commercial awareness and confidence and encourage development of an open
ecosystem by integrating components from different players.
2 References
2.1 Normative references
References are either specific (identified by date of publication and/or edition number or version number) or
non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the
referenced document (including any amendments) applies.
Referenced documents which are not found to be publicly available in the expected location might be found in the
ETSI docbox.
NOTE: While any hyperlinks included in this clause were valid at the time of publication, ETSI cannot guarantee
their long-term validity.
The following referenced documents are necessary for the application of the present document.
Not applicable.
2.2 Informative references
References are either specific (identified by date of publication and/or edition number or version number) or
non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the
referenced document (including any amendments) applies.
NOTE: While any hyperlinks included in this clause were valid at the time of publication, ETSI cannot guarantee
their long-term validity.
The following referenced documents may be useful in implementing an ETSI deliverable or add to the reader's
understanding, but are not required for conformance to the present document.
[i.1] ETSI Directives Version 51 (June 2025).
3 Definition of terms, symbols and abbreviations
3.1 Terms
For the purposes of the present document, the following terms apply:
DATA PoC proposal: initial description of a PoC Project, submitted as a contribution for review and acceptance by the
TC DATA before the PoC Project starts
NOTE: See annex A.
DATA PoC report: detailed description of the results and findings of a PoC project, submitted once the PoC Project
has finished
PoC demo objective: detailed description of one particular aspect that the PoC Team intends to demonstrate and how it
will be achieved
ETSI
7 ETSI TS 104 200 V1.1.1 (2025-11)
PoC project: activity oriented to perform a PoC according to the framework described in the present document
PoC review team: entity in charge of administering the PoC activity process
PoC scenario report: collection of PoC Demo Objectives
NOTE: See annex B.
PoC team: organizations participating in the PoC Project
3.2 Symbols
Void.
3.3 Abbreviations
For the purposes of the present document, the following abbreviations apply:
AI Artificial Intelligence
API Application Programming Interface
CTI Centre for Testing and Interoperability
EU European Union
F2F Face to Face
ICT Information Computing Technology
IoT Internet of Things
LD Low Delay
NGSI Next Generation Service Interface
PoC Proof of Concept
SAREF Smart Appliance Reference ontology
SDG Software Development Group
TG Technical Group
ToR Terms of Reference
vMME virtual Mobility Management Entity
4 TC DATA PoC Framework
4.1 Rationale
The distributed solutions considered by TC DATA include data infrastructures, data products, data access services, and
Application Interfaces (APIs) in the ICT domain, to be used by machines and human beings, and their virtual
representations. These solutions address the three dimensions of distributed data processing, i.e. Connectivity (data in
transit), Storage (data at rest) and Compute (data in process).
Proof of Concepts (PoCs) are an important tool to demonstrate DATA Solutions as a viable technology. Results from
PoCs may guide the work in the TC DATA by providing feedback on interoperability and other technical challenges.
The public demonstration of these DATA Solutions concepts will help build commercial awareness and confidence in
this DATA solutions approach, and develop a diverse, open DATA solutions ecosystem. A single PoC demonstration
will impact its immediate audience, but a cumulative set of successful PoCs will provide industry momentum for
DATA solutions concepts.
The PoCs shall adopt the DATA solutions use cases as a working baseline and address the technical challenges and
approaches therein using [i.1].
4.2 Call for PoCs
The ETSI TC DATA calls for PoC proposals during the life of the TC. Details will be made publicly available on the
ETSI TC DATA portal.
ETSI
8 ETSI TS 104 200 V1.1.1 (2025-11)
4.3 TC DATA PoC Proposal Submission
PoC Team formation is beyond the scope of the TC DATA. The PoC Team shall prepare a TC DATA PoC Proposal
according to the TC DATA PoC Proposal template in clause A.1, and the TC DATA PoC Review Team may be
consulted in support of this effort. The PoC Proposal shall be submitted to the TC DATA as a contribution uploaded on
the ETSI Portal and a link to the contribution shall
...








Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.
Loading comments...